My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
4747
>
1600 - Food Program
>
PR0162841
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2020 5:32:21 PM
Creation date
8/25/2020 3:12:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
WORK PLANS
RECORD_ID
PR0162841
PE
1615
FACILITY_ID
FA0008109
FACILITY_NAME
WEST LANE CHEVRON
STREET_NUMBER
4747
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
10437010
CURRENT_STATUS
01
SITE_LOCATION
4747 WEST LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
JCastaneda
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REVISIONS BY <br /> (N) DISTRIBUITON SWITCHBOARD, 400 AMPS, 208Y/120V, 30, 4W, 35KAIC <br /> - - - - - - - - - - - - - <br /> SHEET NOTES : GENERAL NOTES : <br /> M I I O PROVIDE TYPE WRITTEN PANEL DIRECTORY AT COMPLETION OF PROJECT. 1 . ELECTRICAL CONTRACTOR TO PROVIDE GROUNDING ELECTRODE SYSTEM IN <br /> COMPLIANCE WITH CEC ART. 250. GROUND ELECTRODE RESISTANCE TO EARTH <br /> l 400A O PROVIDE NEW LAMINATED PANELBOARD'S NAMEPLATE. SHALL BE 25 OHMS OR LESS. ELECTRICAL CONTRACTOR SHALL PROVIDE <br /> / 2 SUPPLEMENTARY ELECTRODES WITHOUT ADDITIONAL COST TO THE OWNER AND <br /> NEUT. BUS 3P 3 CONSULTANT TO ACHIEVE THE REQUIRED ELECTRODE RESISTANCE TO EARTH. CONSULTANT <br /> O ELECTRICAL EQUIPMENT, SUCH AS SWITCHBOARDS, SWITCHGEAR, PANELBOARDS, INDUSTRIAL CONTROL <br /> MBJ EQPT. GRD. US PANELS, METER SOCKET ENCLOSURES, AND MOTOR CONTROL CENTERS, THAT ARE IN OTHER THAN <br /> DWELLING UNITS, AND LIKELY TO REQUIRE EXAMINATION, ADJUSTMENT, SERVICING, OR MAINTENANCE 2. ELECTRICAL CONTRACTOR SHALL FIELD VERIFY THE SIZE/RATING OF ALL ELECTRICAL <br /> EQUIPMENTS AND COMPARE WITH THE DRAWINGS. ANY DISCREPANCY FOUND BETWEEN 9altlePulld@9eaeetb,,gC2249 T AN°5 <br /> EBJ I (N) (N) (N) I WHILE ENERGIZED, SHALL BE FIELD OR FACTORY MARKED TO WARN QUALIFIED PERSONS OF POTENTIAL THE DRAWINGS AND ACTUAL INSTALLATION SHOULD BE IMMEDIATELY REPORTED TO THE <br /> ELECTRIC ARC FLASH HAZARDS PER CEC ART. 110.16. oh.,.',5,os 8�,z2a <br /> 200A � 200A � 40A SPACE I ENGINEER UNDERSIGNED BEFORE TURNING ON THE SERVICE. °9�m <br /> 3P 3P 3 PI ENERGY CONSUL TING <br /> 3. PROPERLY PHASE COLOR ALL FEEDER AND BRANCH CIRCUIT CONDUCTORS. a ENGINEERING SERVICES <br /> www.gEoenerg_vcon--uitlng.com <br /> (N)1 -5"C <br /> T� (N)400A MAIN DIST. PANEL i <br /> PG&E U U U LOCATION: INDOOR MAIN: 400A VOLTS: 208/120V FEEDER Q�pFESS/ON <br /> TRANSFORMER GEC ACOCUNTING ESSORIES: SURFACE BUS: 400A 4W AIC RATING: 22KAIC PLEASE SEE SINGLE LINE DRAWING <c�0 ���N gq� <br /> GEC Q p Q p Q z SWITCH/CB ACCESSORIES w No. 21313 m <br /> z z 0 CIRCUIT M <br /> GEC O U o U ao DESCRIPTION KVA PHASE FLA Exp,09-30-21 <br /> M - NUMBER SW/CB FRAME FUSE/TRIP POLE TYPE <br /> U U U O 1 (N) PANEL "A" 51 3 142 CB 100 100 3 T/M F OF CA��Fp��\� <br /> U U 2 (N) PANEL "B" 47 3 131 CB 100 100 3 T/M <br /> - 3 EVC 10 3 28 CB 60 40 3 T/M <br /> ^ ^ 4 SPACE 3 CB 3 <br /> C�d C�6 <br /> TOTALS 108 1 3 1 301 REMARKS <br /> UFER GROUND, <br /> (N) PLUS 25% OF LARGEST MOTOR 12 T/M = THERMAL MAGNETIC <br /> TOTAL AMPERES PER NEC 430.24 313 <br /> 20' OF #4 REBAR 50A EVC <br /> MAIN COLD WATER PIPE EACH WAY 3P <br /> U VOLTS: 120/208V MAIN: 200A, 3P <br /> PANEL Q = PANEL PHASE: 3 (N) PANEL "B" BUSSING: 225A <br /> MBJ - MAIN BONDING JUMPER, #1/0 BCU. "A" "B" WIRE: 4 LOCATION: UTILITY ROOM AREA TYPE: BOLT-ON <br /> EBJ - EQUIPMENT BONDING JUMPER, #1/0 BCU. 1 2 U 1 2 AIC: 22KAIC ISOLATED GROUND BUS: N/A MOUNTING: SURFACE <br /> GEC - GROUNDING ELECTRODE CONDUCTOR, #1/0 BCU. I o <br /> U LOAD LOAD WATTS LOAD LOAD <br /> CKT BKR DESCRIPTION (VA) A B C (VA) DESCRIPTION BKR CKT <br /> A. 1 50 WALK-IN FREEZER 4803 6724 1921 WALK-IN COOLER 20 2 <br /> 3 4803 6724 1921 4 <br /> 5 3P " 4803 6724 1921 3P 6 <br /> 7 20-1P EQUIP.#5 COFFEE MACHINE 1200 2400 1200 EQUIP.#5 COFFEE MACHINE 20-1P 8 <br /> 9 20-1P EQUIP.#5_COFFEE MACHINE 1200 2400 1200 EQUIP.#6_SODA MACHINE 20-1P 10 <br /> SINGLE LINE DIAGRAM O 11 20-1P EQUIP.#6_SODA MACHINE 1200 2400 1200 EQUIP.#6_SODA MACHINE 20-1P 12 <br /> 13 20-1P EQUIP.#7_SMOOTHIE MACHINE 1200 2400 1200 EQUIP.#7_SMOOTHIE MACHINE 20-1P 14 <br /> E2.0 NOT TO SCALE (N) 15 20-1P EQUIP.#7_SMOOTHIE MACHINE 1200 2400 1200 EQUIP.#8_ICE MAKER MACHINE 20-1P 16 <br /> PANEL 17 20-1P EQUIP.#9_ATM MACHINE 500 1000 500 CASH REGISTER 20-1P 18 <br /> "A" 19 20-1P HAND DRYER FIRST FLOOR) 1200 2400 1200 HAND DRYER SECOND FLOOR) 20-1P 20 <br /> 1 2 21 20-1P HAND DRYER FIRST FLOOR) 1200 2400 1200 SIGNAGE 20-1P 22 Q <br /> 23 SPACE 0 SPACE 24 <br /> 25 SPACE 0 SPACE 26 <br /> 27 SPACE 0 SPACE 28 <br /> VOLTAGE DROP CALCULATION FROM MSB TO PAN EL(MAXI MUM VOLTAGE DROP REQUIREMENT 2%) 29 SPACE 0 SPACE 30 W <br /> 31 SPACE 0 SPACE 32 <br /> MAXIMUM FEEDER NUMBER 33 SPACE 0 SPACE 34 __j <br /> RESISTANCE VOLTAGE OF 35 SPACE 0 SPACE 36 D <br /> PANEL CURRENT FEEDER SIZELENGTH PHASE MULTIPLIER VOLTAGE DROP VOLTAGE DROP(%) <br /> (A) (OHM/KFT) (FT) (V) PARALLEL 37 SPACE 3060 3060 PANEL"Al" 50 38 Q <br /> RUNS 39 SPACE 3842 3842 ' 40 v LU <br /> MSB TO PANEL"A" 200 3/0 0.0766 10 208 1 3 1.732 0.27 0.13% 41 SPACE 2340 2340 3PI 42 - Z <br /> MSBTOPANEL"B" 200 3/0 0.0766 10 208 1 3 1.732 0.27 0.13% CONNECTED kVA PER PHASE 16.98 17.77 12.46 U <br /> PANEL"A" TO PANEL"Al" 1 50 6 1 0.491 1 10 1 208 1 1 1 3 1 1.732 1 0.43 1 0.20% conn. demand demand <br /> Vd-(IxRxLxM)/(1000xP) DEMAND FACTOR APPLICATIONS load factor load z <br /> (kVA) (%) (kVA) <br /> _j LLI <br /> Vd=Voltage Drop in volts RECEPTACLE (FIRST 10kVA) 9.2 100% 9.2 TOTAL CONNECTED LOAD: 47.2 kVA LU z <br /> P= Number of parallel runs RECEPTACLE(OVER 10kVA) 0.0 50% 0.0 25% OF HIGHEST MOTOR LOAD 3.6 _jQ <br /> I=Current in Amps CONTINUOUS LOADS 1.2 125% 1.5 TOTAL DEMAND LOAD: 51.1 kVA V a-- <br /> R= Resistance in ohms per kft NON-CONTINUOUS LOADS 36.8 100% 36.8 TOTAL SERVICE: 141.9 Amps z <br /> M= Multiplier, 2for single phase or 1.732050808 for three phase `- <br /> v J <br /> VOLTS: 120/208V MAIN: 200A, 3P <br /> 2 VOLTAGE DROP CALCULATION PHASE: 3 (N) PANEL "B" BUSSING: 225A <br /> WIRE: 4 LOCATION: UTILITY ROOM TYPE: BOLT-ON <br /> �-o <br /> NOT TO SCALE AIC: 22KAIC ISOLATED GROUND BUS: N/A MOUNTING: SURFACE <br /> LOAD LOAD WATTS LOAD LOAD <br /> VOLTS: 120/208V MAIN: MLO (50A,3P) CKT BKR DESCRIPTION (VA) A B C (VA) DESCRIPTION BKR CKT 0 <br /> PHASE: 3 (N) PANEL "Al" BUSSING: 100A 1 60 AC-1 5885 9218 3333 WH-1 40 2 LZ <br /> WIRE: 4 LOCATION: UTILITY ROOM AREA TYPE: BOLT-ON 3 1. 5885 9218 3333 ' 4 <br /> 5 3P " 5885 9218 3333 ' 3P 6 <br /> AIC: 22KAIC ISOLATED GROUND BUS: N/A MOUNTING: SURFACE CLI O O <br /> 7 30 AC-2 2570 3903 1333 WH-2 20 8 0 LU N <br /> LOAD LOAD WATTS LOAD LOAD 9 2570 3903 1333 10 Ln <br /> CKT BKR DESCRIPTION (VA) A B C (VA) DESCRIPTION BKR CKT 11 3P " 2570 3903 1333 3P 12 U U <br /> 1 20-1P RECEPTACLES (1 F) 1260 2340 1080 RECEPTACLES (1F) 20-1P 2 13 40-1P POU-1 3500 3500 SPARE 20-1P 14 w v W U <br /> 15 20-11P SPARE 0 SPARE 20-1 P 16 <br /> 3 20-1P RECEPTACLES (1F) 900 2340 1440 RECEPTACLES (2F -OFFICE) 20-1P 4 w z <br /> 17 20-1 P SPARE 0 SPARE 20-1 P 18 <br /> 5 20-1P RECEPTACLES (2F) 900 2340 1440 RECEPTACLES (2F -OFFICE) 20-1P 6 z w 0 <br /> 7 20-1P TEL./DATA BACKBOARD 360 720 360 RECEPTACLE @ ROOF 20-1P $ 19 20-1P SPARE 0 SPARE 20-1P 20 Ou <br /> 9 20-11P LIGHTINGS 906 1502 596 EXTERIOR LIGHTING 20-1P 10 21 SPACE 0 SPACE 22 �: 0 U <br /> 11 20-1P SPARE 0 SPARE 20-1P 12 23 SPACE 0 SPACE 24 z Q <br /> 13 20-1P SPARE 0 SPARE20-1P 14 25 SPACE 0 SPACE 26 , ^ <br /> 15 20-1P SPARE 0 SPARE 20-1P 16 27 SPACE 0 SPACE 28 U ) <br /> 17 20-1P SPARE 0 SPARE 20-1P 18 29 SPACE 0 SPACE 30 W <br /> 19 20-1P SPARE 0 SPARE 20-1P 20 31 SPACE 0 SPACE 32 <br /> 21 SPACE 0 SPACE 22 33 SPACE 0 SPACE 34 <br /> 23 SPACE 0 SPACE 24 35 SPACE 0 SPACE 36 <br /> 25 SPACE 0 1 ISPACE 26 37 SPACE 0 SPACE 38 <br /> 27 SPACE 0 ISPACE 28 39 SPACE 0 SPACE 40 <br /> 29 SPACE 0 ISPACE 30 41 SPACE 0 SPACE 42 <br /> CONNECTED kVA PER PHASE 3.06 1 3.84 2.34 CONNECTED kVA PER PHASE 16.62 13.12 13.12 DATE <br /> 03/05/2020 <br /> conn. demand demand conn. demand demand <br /> DEMAND FACTOR APPLICATIONS load factor load DEMAND FACTOR APPLICATIONS load factor load SCALE <br /> (kVA) (%) (kVA) (kVA) (%) (kVA) <br /> AS S110WN <br /> RECEPTACLE(FIRST 10kVA) 7.7 100% 7.7 TOTAL CONNECTED LOAD: 9.2 kVA RECEPTACLE (FIRST 10kVA) 0.0 100% 0.0 TOTAL CONNECTED LOAD: 42.9 kVA DRAWN <br /> RECEPTACLE(OVER 10kVA) 0.0 50% 0.0 SPARE CAPACITY RECEPTACLE (OVER 10kVA) 0.0 50% 0.0 25% OF HIGHEST MOTOR LOAD 4.4 GEA <br /> CONTINUOUS LOADS 1.5 125% 1.9 TOTAL DEMAND LOAD: 9.6 kVA CONTINUOUS LOADS 0.0 125% 0.0 TOTAL DEMAND LOAD: 47.3 kVA JOb <br /> NON-CONTINUOUS LOADS 0.0 100% 0.0 TOTAL SERVICE: 26.7 Amps NON-CONTINUOUS LOADS 42.9 100% 1 42.9 TOTAL SERVICE: 131.2 Amps <br /> SHEET <br /> 3 PANEL SCHEDULES Ef 2 0 <br /> �-o <br /> NOT TO SCALE <br />
The URL can be used to link to this page
Your browser does not support the video tag.