My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
800
>
2300 - Underground Storage Tank Program
>
PR0231349
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/27/2024 11:04:21 AM
Creation date
8/25/2020 3:25:50 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0231349
PE
2351 - UST FACILITY - 2481 COMPLIANT
FACILITY_ID
FA0003633
FACILITY_NAME
ARCO 07049
STREET_NUMBER
800
Direction
E
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
Lodi
Zip
95240
APN
06206042
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\lsauers1
Supplemental fields
Site Address
800 E Kettleman LN Lodi 95240
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
139
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f:yJ <br /> Determine drop tube lengths <br /> Defender Spill Contain ent(Ref.) <br /> Seat surface of upper drop tube <br /> o <br /> Upper Drop Tube_ Top of Tank <br /> Final Shutoff Volume" <br /> Overfill Prevention Valve <br /> T1 <br /> {tw <br /> (U.S.T.) 11 <br /> Lower "B" <br /> Drop Tube <br /> ..Y„ l <br /> ` I <br /> _ I <br /> 1 � l <br /> / 6" (152 mm) Max* <br /> Bottom of Tank Not to Scale <br /> ' If local codes require this distance to be smaller,—] <br /> subtract less than 6"(152mm) <br /> Calculate final shutoff volume <br /> To find Upper Drop Tube length"X"' To find Lower Drop Tube length"Y" <br /> ActualTank <br /> � city Drop tube seat <br /> „ Final shutoff <br /> Gallons <br /> "A" I L� surface to "B" volume height <br /> bottom of tank <br /> X (Multiply) - (Subtract) - (subtract) OP Length I <br /> -J� Typically 95%-- „B„ Final shutoff 15'/:'(400 mm) onset <br /> i _J volume height _ (subtract) <br /> (gshutoff volume subtract <br /> all <br /> (subtract) <br /> Position and �I 6"(152mm) Tank bottom <br /> (gallons) 21/2-(63.5 mm) mounting I clearance <br /> adjustment <br /> _(equals) _(equals) <br /> _ B „X„ <br /> Final Shutoff Volume Height Upper Drop ube Length i tower DMO Tube Larath <br /> 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.