Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM (Paged of 6) <br /> Ville MONITORING SYSTEM AND PROGRAMMING <br /> This section must be completed if a monitoring panel is used to perform leak detection monitoring. Y N NA <br /> Are the visual and audible alarms operational? 0 ❑ ❑ <br /> Were all sensors visually inspected for kinks and breaks in the cables and for residual buildup to ensure that floats move freely, a ❑ ❑ <br /> functional) tested, and confirmed operational? <br /> Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with 0 1:1 El <br /> ro er operation? <br /> Was monitoring system set-up reviewed to ensure proper settings? © ❑ ❑ <br /> Was the monitoring panel's backup battery visually inspected , functionally tested, and confirmed operational? ] [� ❑ <br /> Does the flow of fuel stop at the dispenser if a leak is detected in the underAispenser containment? 0 ❑ ❑ <br /> Does the turbine automatically shut down if the piping secondary containment monitoring system fails to operate or is electrically o ❑ ❑ <br /> disconnected? <br /> Does the turbine automatically shut down If the piping secondary containment monitoring system detects a leak? © ❑ ❑ <br /> Which sensors initiate positive shut down? (Check all that apply. ) ❑X Sump u Under-Dispenser Containment <br /> If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. , modem) operational? © ❑ ❑ <br /> For any answer of "N" above, describe in Section IX how and when these deficiencies were or will be corrected. <br /> IX . COMMENTS <br /> i <br /> I <br /> X . INJANK GAUGING TESTING <br /> ❑ Check this box if tank gauging is used only for inventory control, (Do not complete this section.) <br /> ❑ Check this box if NO tank gauging equipment is installed. (Do not complete this section.) YN NA <br /> This section must be completed if in-tank gauging is used to perform leak detection monitoring, <br /> Has all input wiring been Inspected for kinks and breaks in the cables and for proper entry and termination, including testing for ❑ 1:1round faults? <br /> Were all In-tank gauging probes visually inspected for damage and residue buildup to ensure that floats move freely, functionally 0 ❑ ❑ <br /> tested, and confirmed operational? <br /> Was accuracy of system's product level readings tested? ❑X I ❑ ❑ <br /> Was accuracy of system's water level readings tested? ❑X ❑ ❑ <br /> Were all probes reinstalled properly? ❑X ❑ ❑ <br /> Were all items an the equipment manufacturer's maintenance checklist compieted7 ❑X ❑ ❑ <br /> For any answer of "M' above, describe in Section X1 how and when these derrclencies were or will be corrected. <br /> XI . COMMENTS <br /> Y = Yes, N = No, NA = Not Applicable <br />