Laserfiche WebLink
o o ) 01 1211o ) iq � N <br /> CaliforniaVJ <br /> . derground Storage Tank = Tank Information <br /> Facility/Site <br /> ARCO 07049 CERS ID <br /> 00 E Kettleman Ln 10339507 <br /> Lodi, CA 95240 Tank IDN : 1 CERS Tank ID : 10339507-005 <br /> Submittal Status <br /> Submitted on 11/25/2019 by Christian Torres of BP West Coast Products LLC - Retail ( Carson) <br /> Comments by submitter: NEW TANK INSTALLATION <br /> Submittal was Accepted; Processed on 12/3/2019 by Shewit-Tassew Woldearegay for San Joaquin County Environmental Health <br /> Comments by regulator: This UST submittal was accepted by Shewit Woldearegay, EHS, ICC Certified UST Inspector, on December 3, 2019 . This acceptance is subject t <br /> erification at the next scheduled field inspection . <br /> Type of Action <br /> Type of Action ( UST Tank) <br /> New Permit <br /> Facility Information <br /> ARCO 07049 <br /> 00 E Kettleman Ln <br /> Lodi, CA 95240 <br /> Tank Description <br /> Tank IDN / CERS Tank IDH Date UST System Installed Tank Configuration <br /> 1 / 10339507-005 8/2/2019 A Stand-alone Tank <br /> Tank Manufacturer Date Existing UST Discovered Number of Compartments in the Unit <br /> CONTAINMENT SOLUTIONS 1 <br /> ank Capacity In Gallons Date UST Permanently Closed Additional Description <br /> 5000 <br /> Tank Use and Contents Tank Construction <br /> Tank Use Tank Contents Type of Tank <br /> Motor Vehicle Fueling Regular Unleaded Double Wall <br /> Other Petroleum Contents Primary Containment Secondary Containment <br /> Fiberglass Fiberglass <br /> Other Non-Petroleum Contents <br /> verfill Protection <br /> es Audible/Visual Alarms Fill Tube Shut-Off Valve <br /> Ball Float Exempt <br /> Product / Waste Piping Construction <br /> iping Construction Primary Containment Secondary Containment Piping/Turbine Containment Sump <br /> Double-walled Fiberglass Fiberglass Double-walled <br /> iping System Type <br /> Pressure <br /> Vent, Vapor Recovery (VR) and Riser / Fill Pipe Piping Construction <br /> Primary Containment Vapor Recovery Primary Containment Riser Pipe Primary Containment Vent Piping Transition Sumps <br /> Fiberglass Fiberglass Steel Double-walled <br /> Fill Components Installed <br /> Secondary Containment Vapor Recovery Secondary Containment Riser Pipe Secondary Containment Yes Spill Bucket <br /> Fiberglass Fiberglass Fiberglass Yes striker Plate/Bottom Protector <br /> Yes Containment Sump <br /> Under Dispenser Containment ( UDC) Corrosion Protection <br /> Construction Type Construction Material Sacrificial Anode <br /> Double-walled Fiberglass Impressed Current <br /> Yes Isolation <br /> ill <br /> T Y13. All ( 2 2UI 1 <br /> a o I X20 <br /> Printed on 12/10/2019 12 : 19 PM <br /> I <br />