Betty Ho , EHS <br /> San Joaquin County .SAN <br /> Environmental Health Department ( EHD ) 44 January 11 , 2018 <br /> , . _ . <br /> Response : See Enclosure No , 4 . The drawings have been revised per this comment to <br /> show the sensors at the lowest position points . <br /> 12) Drawing G. 0. 2. 2 (12) indicates that sumps will be tested with standing water, provide <br /> manufacturer's approval. <br /> Response : See Enclosure No . 8 . The manufacturer' s installation instructions have been <br /> provided . <br /> 13) Drawing G. 0. 2. 2 (14) indicates that sensors will be affixed to the sump wall next to <br /> penetrations, it's unclear how they will be mounted. Provide accurate depiction of how <br /> sensors will be affixed to sump wall. <br /> Response : See Enclosure No . 4 , Sheet M . 5 . 3 . 12 , detail " H " ; see also Enclosure No . 9 <br /> certifying that the bonding of the sump sensor holder is acceptable to the manufacturer, <br /> Containment Solutions . <br /> 14) Drawing M. 5. 3. 03 indicates that deadman are optional, provide clarification and supporting <br /> calculations. <br /> Response : Enclosure No . 4 has been revised per this comment for deadman tank anchoring <br /> ( no options ) . <br /> 15) Drawing M. 5. 3. 12 (A, B, C, D, E, F), shows that ball valves will be installed between sensors <br /> and the interstitial spaces, this proposed set up cannot be approved. Revise and resubmit. <br /> Response : Enclosure No . 4 has been revised to omit the valves . <br /> 16) Drawing M. 5. 3. 23 shows that sump sensor holder pipe is touching sump bottom obstructing <br /> sensor's visibility for its position verification, provide accurate location of sump holder. <br /> Response : Enclosure No . 4 has been revised per this comment to show accurately the <br /> location of the sump holder. <br /> 17) Drawing M. 5. 3. 26 and G. 0. 7. 2, shows that fill sump shield will not be removable once <br /> concrete is installed, sump depictions should stylistically match their respective cut sheets. <br /> Revise and resubmit. <br /> Response : Enclosure No . 4 has been revised per this comment to display the fill sumps in a <br /> manner that matches their manufacturer's cut sheets . <br /> 18) Indicate on M. 5. 3. 05 of the install plan if there are striker plates for the premium fill sump and <br /> the diesel submersible turbine sump. <br /> Response : Enclosure No . 4 has been revised per this comment. Striker plates are installed <br /> at all tank openings . <br /> 19) On M. 5. 3. 23, the brine reservoir and hydrostatic sensor shows attachment to the sump wall. <br /> Clarify and resubmit accurately the placement location of the brine reservoir and hydrostatic <br /> sensor to ensure the accurate fluid level change in reservoir and interstitial space. <br />