Laserfiche WebLink
Fiber Glass Systems I KOY Production Solutions <br /> October 7, 2019 <br /> Arco <br /> 800 East Kettleman Lane, <br /> Lodi, CA 95240 <br /> Perthe general installation instructions , minimum clearance on pipe crossings is 2 . 5" . In a <br /> situation where 2 . 5" inches of clearance is not possible, crossings need to be padded with 'A" or <br /> thicker rubber placed over the pipe crossing . The bedding of the pipe must be done properly, and <br /> special attention must be paid to make sure padding remains in place during the backfill process . <br /> The 2 . 5" of clearance must be met on all pipe crossings, orthe pipes padded per our instructions <br /> to satisfy NOV requirements . The workmanship, and the execution of the above is soley the <br /> responsibility of the installer. <br /> Respectfully yours, <br /> ame <br /> Mrs . Lisa Blassingame <br /> Fuel Handling Sales Manager — US & Canada <br /> T 210-842-5777 915 Audra St. <br /> F 210- 247-0598 Cedar Park, TX. 78613 <br /> Lisa , Blassingame@nov.com <br />