Laserfiche WebLink
Iota CGRS <br /> Secondary Flow Communication Test Certification <br /> Location: CGRS Project No : 6-9333-18263-10000 <br /> Arco AM/PM Test Date: November 7, 2019 <br /> 800 E. Kettleman Ln CGRS Techs: Sergio Nunez & Gerardo <br /> Hernandez <br /> Lodi, CA 95240 <br /> CGRS certifies that at the time the final ELD testing was performed,air flow communication was confirmed <br /> throughout the secondary piping components listed below. <br /> Piping Secondary Communication Confirmation <br /> COMPONENTS RESULTS <br /> 87 PL PASS <br /> 91 PL PASS <br /> DSL PL PASS <br /> 87 Vent PASS <br /> 91 Vent PASS <br /> DSL Vent PASS <br /> VR PASS <br /> IOTA Tech Signature: 11/7/2019 <br /> Sergio L. nez CA Tank Test 0 - 7 Date <br /> H E El V E D <br /> " Vi2Z019 <br /> Reviewed by: FNIVIRONMENTAL HEALTii/8/2019 <br /> Chris Murphy Direc r of CA Services EPARTMENT Date <br />