Laserfiche WebLink
19204314.5 <br /> UNDERGROUND STORAGE TANK <br /> OVERFILL PREVENTION EQUIPMENT INSPECTION REPORT FORM(Page I of 1) <br /> Type of Action 0 installation Inspection ❑Repair Inspection Ex 36 Month Inspection <br /> I. FACILITY INFORMATION <br /> CERS ID Dale of Overfill Prevention Equipment Inspectlon <br /> 10339507 11/27/2019 <br /> Business Name(Same as Facility Name or DBA-Doing Business As) <br /> Arco 7049 <br /> Business Site Address city ZIP Code <br /> 800 E Kettleman Lane Lodi 95240 <br /> H. UNDERGROUND STORAGE TANK SERVICE TECHNICIAN INFORMATION <br /> Name of UST Service Technician Performing the Inspedlon(Print as shown on the JCC Certification.) Phone# <br /> Elodio Sanchez (925) 551-7555 <br /> Contractor I Tank Tester License# ICC CerUticagon# ICC Certification Explration Dale <br /> 220793 8887127 6/4/2020 <br /> Overfill Prevention Equipment Inspection Training and Certifications(fist applicable cerilfrcations.) <br /> Veeder Root Tech Cert#B41204 Exp. 7/5/2020 <br /> III. OVERFILL PREVENTION EQUIPMENT INSPECTION INFORMATION <br /> Inspection Method Q Manufacturer Guidelines(Specify): <br /> Used: Tank Chart, Veeder Root,Tape Measure <br /> ❑Industry Code or Engineering Standard(Specify): <br /> ❑Engineered Method(Specify): <br /> Attach the Inspection procedures and all documentation required to determine the results. *of Attached Pages <br /> TANK to.,(By tank number,stared product,ata) 87 T1 91 T2 DSL T3 <br /> What is the tank Inside diameter?(Inches) 1001/8 993/8 1007/8 <br /> Is the fill piping secondarily contained? [J Yes ❑No El Yes ❑No [E Yes ❑No E Yes ❑No <br /> Is the vent piping secondarily contained? 0 Yes E No E Yes ❑No [z Yes E No ❑Yes ❑No <br /> Overfill Prevention Equipment Manufaclurer(s) VeederRoot VeederRW veederRoot <br /> What Is the overfill prevention equipment response ❑Shuts Off Flow ❑Shuts Off Flow ❑Shuts Off Flow ❑Shuts Off Flow <br /> when activated? <br /> (Check all that apply.) ❑Restricts Flow ❑Restricts Flow ❑Restricts Flow ❑Restricts Flow <br /> AN Alarm ❑x AIV Alarm El AIV Alarm ❑AIV Alarm <br /> Are flow restriclors Installed on vent piping? ❑Yes I]No ❑Yes Ex No ❑Yes 0 No ❑Yes ❑No <br /> Al what level In the tank is the overfill prevention set <br /> to activate?(inches from bottom of tank.) 1001/8 993/8 1007/8 <br /> What is the percent capacity of the tank at which the <br /> overfill prevention equipment activates? 90 90 90 <br /> Is the overfill prevention In proper operating condition ❑x Yes ❑z Yes EI Yes ❑Yes <br /> to respond when the substance reaches the <br /> appropriate level? ❑No(Specify In V.) E No(Specify In V.) ❑No(Specify in V.) E No(Specify In V.) <br /> IV. SUMMARY OF INSPECTION RESULTS <br /> Overfill Prevention Inspection Results ❑x Pass ❑Fall I ❑x Pass []Fall Q Pass ❑Fail ❑Pass ❑Fail <br /> V. COMMENTS <br /> Any items marked"Fad"must be explained in this section. Any additional comments may also be provided here. <br /> VI. CERTIFICATION BY UST SERVICE TECHNICIAN CONDUCTING THIS INSPECTION <br /> I hereby certify that the overfill prevention equipmentwaspected in accordance with California Code of Regulations,Title 23, <br /> Division 3,Chapter 16,Section 2637.2 an thl Info on con fined herein is accurate. <br /> UST Service Technician Signature <br /> if the facility has more components than this form accommodates,additional copies of this page may be attached. <br /> CERS=Calilwia Reporting Syslem.ID=klen66catia,UST=Underground d Storage Tarts,ICC=International Code Card,AIV=Audible and Visual <br />