Laserfiche WebLink
i <br /> CFM Consolidated Emergency Response / Contingency Plan <br /> INTERNAL FACILITY EMERGENCY COMMUNICATIONS OR ALARM NOTIFICATION WILL OCCUR BY (Check all that apply): ell , <br /> (4 . VERBAL WARNINGS ; Pft PUBLIC ADDRESS OR INTERCOM SYSTEM; 14 3. TELEPHONE; <br /> ❑ 4. PAGERS; Fk . ALARM SYSTEM; JaOi. PORTABLE RADIO <br /> NOTIFICATIONS TO NEIGHBORING FACILITIES THAT' MAYBE AFFEC'T'ED BY AN OFF-SITE RELEASE WILL OCCUR BY (Check all that apply): C12. <br /> `K1 . VERBAL WARNINGS; �& 2. PUBLIC ADDRESS OR INTERCOM SYSTEM; 3. TELEPHONE; <br /> ❑ 4, PAGERS; 5. ALARM SYSTEM; 6, PORTABLE RADIO <br /> EMERGENCY COORDINATOR CONTACT INFORMATION: C13. <br /> PRIMARY EMERGENCY COORDINATOR NA\3E: PHONE NO . : �09 D PHONE NO. :/ <br /> ALTERNATE EMERGENCY COORDINATOR NAME. PHONE NO.2- .( *6HONE NO . : <br /> ❑ Check if additional Emergency Coordinator contact and address infomnation is available onsite or by calling PHONE NO . : <br /> Note: If more than one alternate emergency coordinator is designated, attach a list in order of responsibility. <br /> D. EMERGENCY CONTAINMENT AND CLEANUP PROCEDURES <br /> Check the applicable boxes to indicate your facility's procedures for containing spills and preventing and mitigating releases, fires and/or explosions. <br /> �1 , MONITOR FOR LEAKS, RUPTURES, PRESSURE BUILD-UP, ETC. ; Dl . <br /> 24 PROVIDE STRUCTURAL PHYSICAL BARRIERS (e.g., Portable spill containment walls, built-inn berms); <br /> �. . PROVIDE ABSORBENT PHYSICAL BARRIERS (e.g., Pads, spilt pigs, spill pillows); <br /> CK4. COVER OR BLOCK FLOOR AND/OR STORM DRAINS; <br /> CK5, LINED TRENCH DRAINS AND/OR SUMPS ; <br /> W. AUTOMATIC FIRE SUPPRESSION SYSTEM; <br /> (&7. ELIMINATE SOURCES OF IGNITION FOR FLAMMABLE HAZARDS ; <br /> 048. S'T'OP PROCESSES AND/OR OPERATIONS ; <br /> a9. AUTOMATIC / ELECTRONIC EQUIPMENT SHUT-OFF SYSTEM ; <br /> in 10. SHUT OFF WATER, GAS, ELECTRICAL UTILITIES; <br /> at 1 . CALL 9- 1- 1 FOR PUBLIC EMERGENCY RESPONDER ASSISTANCE AND/OR MEDICAL AID; <br /> JC�i* 1.2, NOTIFY AND EVACUATE PERSONS IN ALL THREATENED AND/OR IMPACTED AREAS; <br /> � 13. ACCOUNT FOR EVACUATED PERSONS IMMEDIATELY AFTER EVACUATION; <br /> 14, PROVIDE PROTECTIVE EQUIPMENT FOR ON-SI'Z'E EMERGENCY RESPONSE TEAM ; <br /> 15 . REMOVE CONTAINERS AND/OR ISOLATE AREAS ; <br /> 16, HIRE LICENSED HAZARDOUS WASTE CONTRACTOR; <br /> IT USE ABSORBENT MATERIAL FOR SPILL CONTAINMENT, <br /> IS. VACUUM SUCTION USING APPROPRIATE VACUUM (e.g., Intrinsically safe) FOR SPILL CONTROL AND/OR CLEANUP; <br /> k2190 . DECONTAMINATE PERSONNEL AND EQUIPMENT WITHIN DESIGNATED AREA AND DISPOSE OF WASTEWATER AS HAZARDOUS WASTE; <br /> 2 . PROVIDE SAFE TEMPORARY STORAGE OF HAZARDOUS WASTE GENERATED DURING EMERGENCY ACTIONS; <br /> 1 . OTHER (Specify): D2. <br /> E . FACILITY EVACUATION <br /> THE FOLLOWING ALARM SIGNALS) WILL BE USED TO BEGIN EVACUATION OF THE FACILITY (Check all that apply): Et . <br /> 1. BELLS; E2, <br /> 2. HORNS/SIRENS ; <br /> , VERBAL (i.e., Shouting); <br /> 4. OTHER (Specify): <br /> THE FOLLOWING LOCATION(S) WILL BE USFOIZ ErRGENCY Sr# SE vIBLY AREAS) (e.g., Parking lot, street comer): E3• <br /> Note: 'The Emergency Coordinator must account f8r all onsite employees hfid visii�orCsa'ffti-r evacuation. <br /> act anon. <br /> EVACUATION ROUTE S AND ALTERNATE EVACUATION ROUTES ARE DESCRIBED AS FOLLOWS : E4. <br /> L WRITTEN PROCEDURES DESCRIBING ROUTES, EXIT'S , AND ASSEMBLY .AREAS ; <br /> ' 2. EVACUATION MAP(S) DEPICTING IZOUTES, EXITS, AND ASSEMBLY AREAS; <br /> ❑ 3. OTHER (Specify): <br /> E5. <br /> Note: Evacuation procedures and/or maps should be posted in visible facility locations and must be included in the Contingency Plan, <br /> F. ARRANGEMENTS FOR EMERGENCY SERVICES <br /> ADVANCE ARRANGEMENTS FOR LOCAL EMERGENCY SERVICES (Check one of the following): rt . <br /> ❑ 1. HAVE BEEN DETERMINED NOT NECESSARY; <br /> r` 2. THE FOLLOWING ARRANGEMENTS HAVE BEEN MADE (Specify): ts. <br /> Note : Advance arrangements with local Lire and police departments, hospitals, state and local emergency response teams, and/or emergency services <br /> contractors should be trade for your facility, if necessary. Large Quantity Generators must describe arrangements in the Contingency Plan. <br /> i <br /> I <br /> Rev. 03/07/17 Page 2 of 4 <br /> i <br /> 1 <br />