Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM (Page 6 of 6) <br /> XVI . MONITORING SITE PLAN <br /> Date site map was prepared : 11 /21 /2018 <br /> If you already have a site plan that shows all required information, you may include it, rather than this page, with your Monitoring System <br /> Certification Form. The site plan must show the general layout of tanks and piping and clearly identify locations of the following equipment, <br /> if installed: 1) monitoring system control panels; 2) in-tank liquid level probes (if used for leak detection); 3) devices monitoring tank <br /> annular spaces or vault; 4) devices monitoring product piping; 5) devices monitoring fill piping; 6) devices monitoring vent piping; 7) devices <br /> monitoring vapor recovery piping; 8) devices monitoring venbtransition sumps; 9) devices monitoring under-dispenser containment; 10) <br /> line leak detectors; and 11) devices monitoring any other secondary containment areas. <br /> Monitoring System Certification <br /> LIST Monitoring Site Plan <br /> •PIPL\G s <br /> — — — — — <br /> SiteAddress: LODI FOOD & LIQUOR 1226 W. LOCKEFORD STREET LODI CA 96240 (_�.RRORS) <br /> - -- - - - - - - - - Drawnne of <br /> piping e.4t of <br /> - _ sump and UDC's. <br /> - No underground <br /> dralaring 2s <br /> accurate, nm <br /> . . . . . . . . . . . . . . . . _ _ _ . . _ . . _ _ _ - I cannot speculate <br /> . . . . . . . . . . . . . . . . . UA prints. <br /> � <br /> C STORE <br /> R <br /> P <br /> KEY <br /> A = ArLNMAR <br /> F = FILLS <br /> 7. 0 _ 5. T = TURBINE <br /> i P = PROBE <br /> V = L'_1POR <br /> X = SUNT SENSOR <br /> - - - L = Leak Detector� W6 <br /> hI = L4fanwmay <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . _ _ . . . . . . . . . . . . . . - B = Brine Sensor <br /> . . . I . . . . I = Smart Sensor <br /> . . . . . . . 0 M . - • - - • - • - - • - - • - • - - • . . . . . S = STP <br /> . C = Floats & ChAin <br /> s <br /> . . . . . . E = £ Step <br /> A?W items mt_derground t ar are nor vi-ible to the ceri&-ing technictmi ora a <br /> prelessionalopbdonon,%, emdare sola&for »Iforntarfonalpurposes. Drmoiute <br /> nor to scale <br /> Date map was drawn: 11122M7 <br /> Instructions <br /> If you already have a diagram that shows all required Information, you may include it, rather than this page, with your Monitoring System Cerb7eatlon. On your site plan , <br /> shay thegeeneral layout of tanks and piping. Clearly identify locations of the following equipment, if installed: monitorarg system control panels; sensors monitoring tank <br /> armulm spaces, sumps , dispenser pans, spill containers, or other seccndary containment areas: mechanical or electronic line leak detectors; and in-tank liquid level <br /> probes (if used for leak detection). In the spam provided, note the date_ this Site Plan was prepared. <br /> LEGEND <br />