Laserfiche WebLink
�.Pa`� '" SAN J 0 A Q U I N Environmental Health Department <br /> � . ...:pG <br /> Q COUNTY Linda Turkatte , , <br /> REHS Director <br /> Kasey Foley, REHS, Assistant Director <br /> % VU Greatness grows here . PROGRAM COORDINATORS <br /> Robert McClellon , REHS <br /> Jeff Carruesco , REHS , RDI <br /> Michael Kith , REHS <br /> Willy Ng , REHS <br /> Muniappa Naidu , REHS <br /> Melissa Nissim , REHS <br /> October 14 , 2019 <br /> KRISTIN NAPPEN <br /> WALTON ENGINEERING INC <br /> PO BOX 1025 <br /> WEST SACRAMENTO , CA 95691 <br /> Re : TESORO ( MOBIL) 68154 <br /> 2500 W LODI AVE SR0081077 <br /> LODI , CA 95240 <br /> The San Joaquin County Environmental Health Department ( EHD ) has completed the review of <br /> the application for a permit to replace the 91 drop tube on the underground storage tank ( UST) <br /> system at the above noted address . The permit has been approved with the following <br /> conditions : <br /> 1 . Contact the local fire department and the San Joaquin Valley Air Pollution Control <br /> District for any applicable permits and requirements . <br /> 2 . Any changes in information and scope of work must be submitted to EHD for approval <br /> prior to commencing work . All new addenda supersede the previous ones . <br /> 3 . Contact Paul Nso at (209 ) 468- 3432 to arrange the following appointments ( a 48 - hour <br /> notice is required for inspection appointments ) . <br /> • Overfill prevention verification : Measurement of drop tubes to verify 95 % tank volume <br /> shut off. Verification of flapper functionality . Ensure that all pertinent tank charts and <br /> calculations are available for review at the time of inspection . <br /> • Verification that ball floats (s) , if installed , do not interfere with the installed flappers <br /> Valve . <br /> • If concrete will be broken near the 91 tank , a secondary containment <br /> test must be performed on these tanks once concrete is poured in accordance with the <br /> manufacturer' s guidelines and test results submitted to the EHD within 30 days of <br /> testing . <br /> Please be aware that the facility cannot receive fuel in the 91 UST system prior to <br /> the EHD inspection and approval, <br /> 4 . Any individual performing the work of a service technician must meet the following <br /> qualifications : <br />