Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> SECONDARY CONTAINMENT TESTING REPORT FORM (Page 1 of 6) <br /> Type of Action ❑ Installation Test ❑ Repair Test ❑Six Month Test ® 36 Month Test <br /> I. FACILITY INFORMATION <br /> CERS ID Date of Secondary Containment Test <br /> 10181447 12/9/2019 <br /> Business Name(Same as Facility Name or DBA-Doing Business A3 " <br /> Speedway/Mobil 4681 <br /> Business Site Address City ZIP Code <br /> 2500 W. Lodi ENVIRONMENTAL HEALT Lodi 95242 <br /> II. UNDERGROUND STORAGE TANK SERVICE TECHNICIAN INFORMATION <br /> Name of UST Service Technician Performing the Test(Print as shown on the ICC Certification) Phone# <br /> Michael McCarter (707)545-5522 <br /> Contractor/Tank Tester License# ICC Certification# ICC Certification Expiration Date <br /> Able Maintenance, Inc.-312844 8819839 10/15/2021 <br /> III. SUMMARY OF SECONDARY CONTAINMENT TESTING RESULTS <br /> TANK ID: (By tank number, stored product, etc.) A 87 B 89 C 91 D Diesel <br /> Tank Containment <br /> Tightness Test Result Z Pass ❑ Fail ❑ NA Z Pass ❑Fail ❑ NA Z Pass ❑ Fail ❑ NA Z Pass ❑ Fail ❑ NA <br /> Product Piping Containment <br /> Tightness Test Result ❑ Pass Z Fail ❑ NA ❑Pass Z Fail ❑ NA ❑Pass Z Fail ❑ NA Z Pass ❑ Fail ❑ NA <br /> Communication Test Result ❑ Pass Z Fail ❑ NA ❑ Pass Z Fail ❑ NA ❑ Pass Z Fail ❑ NA Z Pass ❑ Fail ❑ NA <br /> Remote Fill Piping Containment <br /> Tightness Test Result ❑ Pass ❑ Fail Z NA ❑ Pass ❑ Fail Z NA ❑ Pass ❑Fail Z NA ❑ Pass ❑ Fail Z NA <br /> Communication Test Result ❑Pass ❑ Fail Z NA ❑ Pass ❑ Fail Z NA ❑Pass ❑Fail Z NA ❑ Pass ❑ Fail Z NA <br /> Vent Piping Containment <br /> Tightness Test Result ❑ Pass ❑ Fail Z NA ❑ Pass ❑ Fail Z NA ❑Pass ❑ Fail Z NA ❑ Pass ❑ Fail Z NA <br /> Communication Test Result ❑ Pass ❑ Fail Z NA ❑ Pass ❑ Fail Z NA ❑Pass ❑ Fail Z NA ❑ Pass ❑ Fail Z NA <br /> Vapor Recovery Piping Containment <br /> Tightness Test Result ❑ Pass ❑Fail Z NA ❑ Pass ❑ Fail Z NA ❑Pass ❑ Fail Z NA ❑ Pass ❑Fail Z NA <br /> Communication Test Result ❑ Pass ❑Fail Z NA ❑ Pass ❑Fail Z NA ❑Pass ❑ Fail Z NA ❑ Pass ❑Fail Z NA <br /> Turbine/Product Piping Sump <br /> Tightness Test Result Z Pass ❑ Fail ❑ NA Z Pass ❑ Fail ❑ NA Z Pass ❑ Fail ❑ NA ❑ Pass Z Fail ❑ NA <br /> Fill Riser Sump <br /> Tightness Test Result Z Pass ❑Fail ❑ NA Z Pass ❑ Fail ❑ NA 2 Pass ❑ Fail ❑ NA Z Pass ❑Fail ❑ NA <br /> VENT/TRANSITION SUMP ID: a b C d <br /> Tightness Test Result ❑Pass ❑Fail ❑NA ❑Pass ❑Fail ❑ NA ❑Pass ❑ Fail ❑ NA ❑ Pass ❑Fail ❑ NA <br /> UDC ID: 1 1/2 23/4 35/6 47/8 <br /> Tightness Test Result ❑ Pass Z Fail ❑ NA ❑ Pass Z Fail ❑ NA ❑Pass Z Fail ❑ NA Z Pass ❑ Fail ❑ NA <br /> UDC ID: 59/10 611/12 7 8 <br /> Tightness Test Result Z Pass ❑ Fail ❑ NA Z Pass ❑ Fail ❑ NA ❑Pass ❑ Fail ❑ NA ❑ Pass ❑Fail ❑ NA <br /> UDC ID: 9 10 11 12 <br /> Tightness Test Result ❑ Pass ❑ Fail ❑ NA ❑ Pass ❑ Fail ❑ NA ❑Pass ❑ Fail ❑ NA ❑ Pass ❑Fail ❑ NA <br /> All items marked"Fail"or"NA"must be explained in their respective"COMMENTS"section. <br /> IV. CERTIFICATION BY UST SERVICE TECHNICIAN CONDUCTING THIS TESTING <br /> hereby certify that the secondary containment was tested in accordance with California Code of Regulations,Title 23,Division <br /> 3 Chapter 16,Section 2637 and all the information contained herein is accurate. <br /> UST Service Technician Signature _. <br /> CERS=California Environmental Reporting System,ID=Identificabon,UST=Underground Storage Tank,ICC=International Code Council,NA=Not Applicable,UDC=Under- <br /> Dispenser Containment <br />