My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LODI
>
2500
>
2300 - Underground Storage Tank Program
>
PR0231356
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2022 4:29:57 PM
Creation date
9/1/2020 9:46:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0231356
PE
2361
FACILITY_ID
FA0003815
FACILITY_NAME
TESORO (SPEEDWAY) 68154
STREET_NUMBER
2500
Direction
W
STREET_NAME
LODI
STREET_TYPE
AVE
City
LODI
Zip
95240
APN
02740006
CURRENT_STATUS
01
SITE_LOCATION
2500 W LODI AVE
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
170
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK <br /> SECONDARY CONTAINMENT TESTING REPORT FORM (Page 6 of 6) <br /> XXI. UNDER-DISPENSER CONTAINMENT TESTING INFORMATION <br /> Manufacturers Identify UDC ID from Section III for each Manufacturer <br /> 1 Z2 ✓❑ 3 04 ✓❑ 5 ✓❑ 6 ✓❑ <br /> Environ 7 ❑ 8 ❑ 9 ❑ 10 ❑ 11 ❑ 1 12 ❑ <br /> 1 ❑ 2 ❑ 3 ❑ 4 ❑ 5 ❑ 1 6 ❑ <br /> 7 ❑ 8 ❑ 9 ❑ 10 ❑ 11 ❑ 1 12 ❑ <br /> Test Method Used: ❑ Manufacturer Guidelines (Specify): <br /> ® Industry Code or Engineering Standard (Specify): Hydrostatic <br /> ❑ Engineered Method(Specify): <br /> #of Attached Pages <br /> Attach the testing procedures and all documentation required to determine the results. <br /> UDC Testing Training and Certifications(List applicable certifications.) Expiration Date <br /> ICC UST Certification#8819839 10/15/2021 <br /> INCON TS-STS L4-Certification# 1019623710 9/24/2020 <br /> XXII. COMMENTS <br /> Provide any additional comments here. <br /> UDC 1/2, 3/4, 5/6 failed due to torn test boots. <br /> UDC 7/8 failed, made adjustments retested and failed. Tightened hose clamps on conduit penetrations, retested and passed. <br /> If the facility has more components than this form accommodates,additional copies of these pages may be attached. <br /> UDC=Under-Dispenser Containment;ID=Identification <br />
The URL can be used to link to this page
Your browser does not support the video tag.