Laserfiche WebLink
CNI Manufacturing Installation , Operation and Maintenance Manual ( IOM ) <br /> Applicable to Executive Order VR- 104- I <br /> Installation Instructions for the EMCO Wheaton A1100EVR Guardian Installation <br /> NOTE : DO NOT REMOVE the drop tube unless it fails TP201 A D <br /> EMCO `Y'' A1100EVR GUARDIAN <br /> WHEATON RETAIL OVERFILL PREVENTION VALVE <br /> WITH THREADED BOTTOM <br /> Perrrtarrerri Idurnific5tion Infonr� atkxn : - _ % � (���0" 40 .tlo <br /> rvionthlYear of Manufacture . _ « •� . �.• . ' ° <br /> Valve Sleeve - -- <br /> For use with the CNI Manufacturing Phase I EVR System <br /> INSTALLATION INSTRUCTIONS <br /> Caution <br /> 1 . If the underground storage lank is equipped with a ball float vent valve, <br /> make sure it does not extend below the positive shut-off point of the <br /> Al 100EVR Overfill Prevention Valve . If so , the ball float valve must be <br /> removed to allow proper operation of the All00EVR Overfill Prevention <br /> Valve. <br /> 2 . Never disconnect the drop elbow from the fill adapter when the All 100EVR <br /> Overfill Prevention Valve has reached the positive shut- off point of 95 % <br /> total capacity. Note the lank truck hose is still full and must not be <br /> disconnected until enough fuel has been evacuated from the underground <br /> storage tank . This will allow the tank truck hose to drain , and be safe to <br /> disconnect from the fill adapter. Premature disconnection will result in a <br /> hazardous spill and/or a potential for personal injury and property damage . <br /> 3 . Do not use electrical devices near gasoline vapors , as it could result in fire <br /> or explosion. <br /> WarnA2n <br /> 1 . The Al100EVR Overfill Prevention Valve can only be installed after the spill <br /> containment has been installed without the Jam Nut pi/ n 2WJN , contain - <br /> ment nipple and swivel fill adapter in place. <br /> 2 . Do not use a power saw, piping or tubing cutter as this may result in <br /> damage to the top drop tube, voiding warranty. <br /> 3 . Once theAll00EVR Overfill Prevention Valve is completely assembled , <br /> the Seal-All Sealant must cure for a minimum of 24 hours before <br /> Installing into the underground storage tank, <br /> 4 . Only use non -hardening gasoline resistant pipe thread seal compound . <br /> roots Ropuired <br /> 131644 Drill Bit Hacksaw (fine tooth ) Pipo Thread Seat Compound <br /> Pop Rivut Gun Hand f= urs ( fine ) 150-Grit Site Bmery Cloth <br /> Power Drill Marker De-burring Tool wl 410 Blade <br /> Tape tvleasuru Hummer fabric Strap Wrench (2 ) <br /> Lmco Drill Fixture , p/n 566676 CVRSYS116 Containment L-VRSYS112 .lam Nut <br /> Anti -Soize Compound instal lationlRumovaI Tool Ins taltationlRemoval Tool <br /> packing List <br /> ( 1 ) Drop Tuber O- ring #569461 (4 ) Pop Rivets 4b64412 <br /> ( 1 ) Collar 4666679 wirlr O• ring 4480049 ( 1 ) Ccuntur Sink Indenter 4584416 <br /> ( 1 ) SeatWl Galant 4586726 <br /> ( 1 ) Bottom Aluminum Tube Assernbty wiBushing #566189Attached <br /> ( 1 ) A1100GVR Overfill Prevention Valve wrTop Tube 8 Scic%v BaseAnached <br /> 15627 ARROW HIGHWAY, IRWINDALE , CALIFORNIA 91706 <br /> PHONE (626) 962-6646; OUT OF STATE CALLS (800) 4CNI-MFG ; FAx (626) 9624854 61 <br /> WEBSITE: WWW. CNI-MFG. COM EMAIL : INFO(CDCNI-MFG . COM <br />