Laserfiche WebLink
CNI Manufacturing Installation , Operation and Maintenance Manual ( IOM ) <br /> Applicable to Executive Order VR - 104 - 1 <br /> Figure 3 <br /> A AvE- Reser Pipe <br /> % Maximum <br /> E- Fluid Level <br /> A1100EVR Overfill Prevention Valve Installed Below Drain Valve <br /> 2 . Find measurement B from the chart below, the distance from the maximum <br /> fluid level allowed to the inside top of the tank . The calculations are based <br /> on cylindrical tanks with flat ends . For exact dimensions , consult the manu - <br /> facturer ' s tank charts . Local requirements may limit fill capacity to 95 % . <br /> 95 % Shut- off <br /> Tank Diameter B Dimension <br /> Feet Meters Inches mm <br /> 6 . 5 ' 1 . 98 7 . 5" 190 <br /> 7 . 0 ' 2 . 13 $ . 0" 203 <br /> 7 . 6 ' 2 . 29 9 . 0" 229 <br /> 8 . 0 ' 2044 9 . 5" 241 <br /> 8 . 2 ' 2050 9 . 5" 241 <br /> 8 . 5 ' 2059 10 . 0" 254 <br /> 9 . 0 ' 2 . 74 10 . 5" 267 <br /> 9 . 5' 2 . 90 11 . 0" 279 <br /> 10 . 0 ' 3 . 05 11 . 5" 292 <br /> 12 . 0 ' 3 . 66 14 . 0" 336 <br /> IMPORTANT: The All00EVR Overfill Prevention Valve is not recommended <br /> for tanks under 6 . 5 ' ( 1 . 98 m ) in diameter. <br /> 3 . Find measurement C , add measurements A and B minus 3 inches . <br /> Measure and cut the top drop tube to the required length . <br /> Example : Top drop tube cut length , C = A + B - 3" <br /> ✓Place tape measure here <br /> asurement C , cut length <br /> 3 <br /> 15627 ARROW HIGIIWAY , IRWINDALE , CALIFORNIA 91706 <br /> PHONE (626 ) 962-6646 ; OUT OF STATE CALLS ( 800 ) 4CN1 -MFG ; FAX (626 ) 9624854 63 <br /> WEBSITE : WWW. CNI-MFG . COM EMAIL : INFO�CNI - MFG , COMMFG . COM <br />