My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LODI
>
2500
>
2300 - Underground Storage Tank Program
>
PR0231356
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2022 4:29:57 PM
Creation date
9/1/2020 9:46:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0231356
PE
2361
FACILITY_ID
FA0003815
FACILITY_NAME
TESORO (SPEEDWAY) 68154
STREET_NUMBER
2500
Direction
W
STREET_NAME
LODI
STREET_TYPE
AVE
City
LODI
Zip
95240
APN
02740006
CURRENT_STATUS
01
SITE_LOCATION
2500 W LODI AVE
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
170
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i � <br /> v5 2 <br /> ALTON <br /> JAR <br /> Overfill Prevention Inspection - OPW 61 71 eriespD'171 a <br /> Date: / <br /> Owner: <br /> Facility : 00 J . Z ;; ��/ <br /> Overfill Model Number: .,iLmL 0 _ f rC� C) 6;le i--jaIy4 xz <br /> Part 1 - Proper Height Setting Calculation <br /> Tank 1 Tank 2 Tank 3 Tank 4 <br /> Maximum Tank Volume Per. A Gallons <br /> Max shut off requirement for flapper is 95 % B 95 % r �! <br /> Multiply Max tank volume by 95% C Gallons / C-� <br /> Use tank chart or ATG to determine height of <br /> calculated volume D taches <br /> ' <br /> 4 <br /> Measure top of fill riser threads, or face seal <br /> . adapter E Inches <br /> Tank diameter (From Tank Chart) 7F Inches aei <br /> Upper Tube in Tank (G) F-D = G G Inches <br /> Subtract 2" from upper tube in tan K K Inches a ? <br /> Calculated minimum upper tube length (I) <br /> K+E=I I Inches <br /> Actual measured upper tube length (Without <br /> fill adapter) (J) J Inches <br /> Part 2 - Device Certification Criteria Evaluation <br /> Does the overfill prevention device meet the 95 % <br /> requirement? <br /> Is the actual measured upper tube length 6 .5 inches or <br /> more than the fill riser? (J must be 6.5 " or more than E) <br /> Does the overfill prevention device function as required? <br /> (Inspect the device for damage, contamination, freedom of <br /> movement, weakening due to wear and corrosion) <br /> Device Overfill Certification PASS / FAIL <br /> Drop Tube Testing PASS / FAIL <br /> Technician certifies that the device is operationally compliant. <br /> Signature of Technician : Date: <br /> Technician 's Name : <br />
The URL can be used to link to this page
Your browser does not support the video tag.