My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LODI
>
2500
>
2300 - Underground Storage Tank Program
>
PR0231356
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2022 4:29:57 PM
Creation date
9/1/2020 9:46:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0231356
PE
2361
FACILITY_ID
FA0003815
FACILITY_NAME
TESORO (SPEEDWAY) 68154
STREET_NUMBER
2500
Direction
W
STREET_NAME
LODI
STREET_TYPE
AVE
City
LODI
Zip
95240
APN
02740006
CURRENT_STATUS
01
SITE_LOCATION
2500 W LODI AVE
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
170
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Wilson,North Carolina 27893 <br /> Telephone: 2 52.243.0150 <br /> WHEATON RETAIL Web:www.emcoretall.corn <br /> A1100 Overfill Prevention Valve Calculation Sheet <br /> This calculation sheet is to document the dimensions needed for proper installation and should be used <br /> only with the instructions. This sheet assumes 9501a maximum fill based on NFPA30 guidelines.Length <br /> measurements are In Inches. Contact the local Authority Having Jurisdiction(AHJ) to determine all <br /> regulatory requirements regarding rill capacity, <br /> 1. Tank Diameter is TD TD= c j <br /> 2. Tank Capacity is TC TC= <br /> 3. Desired Shutoff Percentage(Note NFPA Guidelines) SO%= _ <br /> 4. Shutoff Tank Capacity TC@ shutoff%=TC x 0.95 //ry! a <br /> 5.Tank Level from Stick Chart for Shutoff Capacity(95%) TL@95% ` <br /> 6. Tank"B" Dimension B=TD-TL@95% B= <br /> 7. Distance from to seal surface T to the to , C <br /> p ( } p(inside)of the tank(2) is A A= y�a C2 <br /> B. Length of OPV top tube to(95%mark)on the Al 100 is C- C=A+B See 7 <br /> Picture. Measure C distance from the 95%line on valve and cut top tube C= <br /> 9. Distance from the top seal surface(t)to the tank bottom is D D=Tank Dia+A D= <br /> 10. OPV Assembly Overall Length OAL=D-6 inches. Screw together top and <br /> bottom tube assemblies. Measure from top tube end and cut bottom tube either <br /> straight or 45 degree at operators preference. (See diagram to insure the 6" <br /> maximum clearance is maintained) OAL= <br /> U S PAT�ES so 0.. <br /> f. The sealing surface refers to the location of the OPV collar sealing point.It maybe the riser pipe or the seal surface built into some spill <br /> buckets. <br /> 2.If the tank uses a manway,be sure to use the tank top for measurement and not the top of the manway as shown in the diagram. <br /> Riser Pipe with Spill Containment Manhole Manway Style Tank <br /> -T <br /> RISER PIPE <br /> -CORTN"MET+I NARROtE <br /> MANWAY A <br /> RISER PIPE <br /> A1100 VALVE ASSEMMY <br /> UNDEACR TAW <br /> ]rORA"E <br /> TAW <br /> �il B <br /> u, e <br /> 0 <br /> 0 <br /> e.o'urot. <br /> 6.0'MAX. <br />
The URL can be used to link to this page
Your browser does not support the video tag.