My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TURNER
>
2420
>
2300 - Underground Storage Tank Program
>
PR0231382
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2020 10:28:22 AM
Creation date
9/1/2020 10:34:50 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0231382
PE
2361
FACILITY_ID
FA0004139
FACILITY_NAME
Plaza liquor and Gas
STREET_NUMBER
2420
Direction
W
STREET_NAME
TURNER
STREET_TYPE
RD
City
LODI
Zip
95242
CURRENT_STATUS
01
SITE_LOCATION
2420 W TURNER RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM ( Page 6 of 6) <br /> 1101111111 <br /> XVI . MONITORING SITE PLAN <br /> Date site map was prepared : <br /> If you already have a site plan that shows all required information, you may include it, rather than this page, with your Monitoring System <br /> Certification Form. The site plan must show the general layout of tanks and piping and clearly identify locations of the following equipment, <br /> if installed: 1) monitoring system control panels; 2) in-tank liquid level probes (if used for leak detection); 3) devices monitoring tank <br /> annular spaces or vault; 4) devices monitoring product piping; 5) devices monitoring fill piping; 6) devices monitoring vent piping; 7) devices <br /> monitoring vapor recovery piping; 8) devices monitoring vent/transition sumps; 9) devices monitoring under-dispenser containment; 10) <br /> line leak detectors; and 11) devices monitoring any other secondary containment areas. <br /> Site Address: PLAZA LIQUORS #2_2= W. TURNER ROAD LODI CA 95242 <br /> WEST TLTF ER ROAD <br /> CAS TANK_ <br /> SUP D <br /> 2. � 4. , <br /> A.–STP SUIP SE\SORS & �F� — <br /> ANNULAR SENSORS . . . " �� TLV O U <br /> F=FILLS <br /> TLAI=Uld <br /> % = SMIP SENSOR . . ' <br /> RUL <br /> TUI <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> TLS 389 <br /> . . . . . . , - kPIPL\G } <br /> - - - - - - - (ARROWS) <br /> . . . . . - - - - Dra{vinc of piping <br /> . . . . . . . . . . . . . STORE exit of sump and <br /> UDC's. 2\ a <br /> . . . . . tmderground <br /> draxi iug is <br /> • cwnot specttfate <br /> blue prints. <br /> Fir <br /> -'I/il• irenc um-krpt araiitirra are tray {isibl a to tics cnT(.[tiug ralaticiarr n'e a <br /> p'Q(assiarn7opiraettonTt• atrlrax- sole�t'fp' b3fannrintnlfxagx�. Drzerfttg <br /> 1701 to sede <br /> I <br /> I <br /> Icctr,rre�� � inr197I9 <br /> If you already have a diagram that shows all required information, you may include it, rather than this page, with your Monitoring System Certif7cation- On your site plan , <br /> show the general layout of tanks and piping. Clearly identify locations of the following equipment, d Installed: monitoring system control panels; sensors monitoring tank <br /> annular spaces, sumps , dispenser pans, spill containers, or other secondary containment areas: mechanical at electronic line leak detectors; and in4ank liquid level <br /> pmhes (if used for leak detection). In the spare provided, note the date this Site Plan was prepar=A. <br /> LEGEND <br />
The URL can be used to link to this page
Your browser does not support the video tag.