Laserfiche WebLink
Appendix IX <br /> UNDERGROUND STORAGE TANK <br /> OVERFILL PREVENTION EQUIPMENT INSPECTION REPORT FORM (Page 1 of 1) <br /> Type of Action ❑ Installation Inspection ❑Repair Inspection ❑36 Month Inspection <br /> I. FACILITY INFORMATION <br /> CERS ID Date of Overfill Prevention Equipment Inspection <br /> Business Name(Same as Facility Name or DBA-Doing Business As.) <br /> Business Site Address City ZIP Code <br /> II. UNDERGROUND STORAGE TANK SERVICE TECHNICIAN INFORMATION <br /> Name of UST Service Technician Performing the Inspection (Print as shown on the ICC Certification.) Phone# <br /> Contractorrrank Tester License# ICC Certification# ICC Certification Expiration Date <br /> Overfill Prevention Equipment Inspection Training and Certifications(List applicable certifications.) <br /> III. OVERFILL PREVENTION EQUIPMENT INSPECTION INFORMATION <br /> Inspection Method Used: <br /> ❑Manufacturer Guidelines(Specify) <br /> ❑ Industry Code or Engineering Standard (Specify) <br /> ❑ Engineered Method (Specify) <br /> Attach the inspection procedures and all documentation required to determine the results. #of Attached Pages <br /> Tank ID: (By tank number,stored product,etc.) <br /> What is the tank inside diameter?(Inches) <br /> Is the fill piping secondarily contained? ❑Yes ❑No ❑Yes ❑ No ❑Yes ❑ No ❑Yes ❑No <br /> Is the vent piping secondarily contained? ❑Yes ❑No ❑Yes ❑ No ❑Yes ❑ No ❑Yes ❑ No <br /> Overfill Prevention Equipment Manufacturer(s) <br /> What is the overfill prevention equipment ❑Shuts Off Flow ❑Shuts Off Flow ❑Shuts Off Flow ❑Shuts Off Flow <br /> response when activated? ❑ Restricts Flow ❑Restricts Flow ❑Restricts Flow ❑ Restricts Flow <br /> (Check all that apply.) ❑AN Alarm ❑AN Alarm ❑AN Alarm ❑AN Alarm <br /> Are flow restrictors installed on vent piping? ❑Yes ❑No ❑Yes ❑No ❑Yes ❑ No ❑Yes ❑ No <br /> At what level in the tank is the overfill prevention <br /> set to activate?(Inches from bottom of tank.) <br /> What is the percent capacity of the tank at which <br /> the overfill prevention equipment activates? <br /> Is the overfill prevention in proper operating ❑Yes ❑Yes ❑Yes ❑Yes <br /> condition to respond when the substance ❑No ❑ No ❑No ❑No <br /> reaches the appropriate level? (Specify in section V.) (Specify in section V.) (Specify in section V.) (Specify in section V.) <br /> IV. SUMMARY OF INSPECTION RESULTS <br /> Overfill Prevention Inspection Results ❑Pass [:] Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> V. COMMENTS <br /> All items marked"Fail'must be explained in this section. Any additional comments may also be provided here. <br /> VI. CERTIFICATION BY UST SERVICE TECHNICIAN CONDUCTING THIS INSPECTION <br /> I hereby certify that the overfill prevention equipment was inspected in accordance with California Code of Regulations,title 23,division 3, <br /> chapter 16,section 2637.2 and all the information contained herein is accurate. <br /> UST Service Technician Signature <br /> If the facility has more components than this form accommodates,additional copies of this page may be attached. <br /> CERS=California Environmental Reporting System,ID=Identification,UST=Underground storage tank,ICC=International Code Council, <br /> AN=Audible and visual <br />