My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
574
>
2300 - Underground Storage Tank Program
>
PR0231405
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2024 2:58:31 PM
Creation date
9/1/2020 2:50:58 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0231405
PE
2361
FACILITY_ID
FA0003164
FACILITY_NAME
NORTH POLE GAS & FOOD INC
STREET_NUMBER
574
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
574 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDRGROUN <br /> ED STORAGE TANK r <br /> OVERFILL PREVENTION EQUIPMENT �€CTION° REPORT FORM (Page 1 of 1 ) <br /> Type of Action ❑ Installation Inspection ❑ Repair Inspection 14 36 Month Inspection <br /> 1. FACILITY��tf�11=0�M�4TIQN <br /> CERS ID Date of Overfill Prevention Equipment inspection. <br /> Ipt� <br /> Business Name (Same as Facility Name or DBA-Doing Business As.) <br /> Business Site Address City ZIP Code <br /> (S'. A .Kz zci Y <br /> 11 . UNDERGROUND: STORAGE T41i :S,E1VICE. TECHNICIA : INFORMATION <br /> Name of UST Service Technician Performing the Inspection (Print as shown on the /CC Certification.) Phone # <br /> Tony Fontana 209 595 - 4489 Ext. <br /> Contractor/Tank Tester License # ICC Certification # ICC Certification Expiration Date <br /> A-846288 11064273 5- 1 -2020 <br /> Overfill Prevention Equipment Inspection Training and Certifications (List applicable certifications) <br /> W C11 `Zld _ j <br /> Ill. OVERFILL PREVENTION Owl Q* <br /> INSPECTi N INFORMATION <br /> Inspection Method Used : ® Manufacturer Guidelines (Specify) inStallatlOn instru tions <br /> ❑ Industry Code or Engineering Standard (Specify) <br /> ❑ Engineered Method (Specify) <br /> Attach the inspection procedures and all documentation -required to determine the results. # of Attached Pages: <br /> Tank ID: (By tank number, stored product, etc) <br /> What is the tank inside diameter? (Inches) �$ A 2 " <br /> Is the fill piping secondarily contained? ❑ Yes Ad No ❑ Yes ,� No ❑ Yes ❑ No ❑ Yes ❑ No <br /> Is the vent piping secondarily contained? ❑ Yes 9 No ❑ Yes No ❑ Yes ❑ No ❑ Yes ❑ No <br /> Overfill Prevention Equipment Manufacturer(s) <br /> What is the overfill prevention equipment Shuts Off Flow Shuts Off Flow ❑ Shuts Off Flow ❑ Shuts Off Flow <br /> response when activated? El Restricts Flow ❑ Restricts Flow El Restricts Flow ❑ Restricts Flow <br /> (Check all that apply.) ❑ A/V Alarm ❑ AIV Alarm <br /> ❑ AN Alam ❑ AN Alam <br /> Are flow restrictors installed on vent piping? ❑ Yes No ❑ Yes No ❑ Yes ❑ No ❑ Yes ❑ No { <br /> At what level in the tank is the overfill prevention <br /> set to activate? (Inches from bottom of tank.) brj <br /> What is the percent capacity of the tank at which <br /> the overfill prevention equipment activates? qS11IO <br /> Is the overfill prevention in proper operating XYes Yes ❑ Yes ❑ Yes <br /> condition to respond when the substance El No No ❑ No ❑ No <br /> reaches the appropriate level? S No m section V. <br /> (Specify ) (Specify in section V.) (Specify in section V.) (Specify in section V) <br /> IV. S.UMMARIEO:>~ IION: RESULTS <br /> Overfill Prevention Inspection Results Pass ❑ Fail YPass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Faii <br /> V. ;COIIIrtEUTS <br /> All items marked "Faii' must be explained in this section. Any additional comments may also be provided here. <br /> VI. CERTIFICATION BY UST SERV/ICE T iliC}AN CONDUCTING THIS' INSPECTION <br /> [chapter <br /> reby certify that the overfill prevention equipment was inspected in,accordance with California Code of Regulations, title 23, division 3, <br /> 16, section 2637.2 and all the information contained hereinis accurate, <br /> Service Technician Signature <br /> If the facility has more components than is fo accommodates, additional copies of this page maybe attached. <br />
The URL can be used to link to this page
Your browser does not support the video tag.