My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
574
>
2300 - Underground Storage Tank Program
>
PR0231405
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2024 2:58:31 PM
Creation date
9/1/2020 2:50:58 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0231405
PE
2361
FACILITY_ID
FA0003164
FACILITY_NAME
NORTH POLE GAS & FOOD INC
STREET_NUMBER
574
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
574 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM (Page 6 of 6) <br /> XVI. MONITORING SITE PLAN <br /> Date site map was prepared:12/02/2019 <br /> If you already have a site plan that shows all required information,you may include it,rather than this page,with your Monitoring System Certification <br /> Form. The site plan must show the general layout of tanks and piping and clearly identify locations of the following equipment,if installed: 1)monitoring <br /> system control panels;2)In-tank liquid level probes(if used for leak detection);3)devices monitoring tank annular spaces or vault;4)devices monitoring <br /> product piping;5)devices monitoring rill piping;6)devices monitoring vent piping;7)devices monitoring vapor recovery piping;8)devices monitoring <br /> vent4ransition sumps;9)devices monitoring under-dispenser containment;10)line leak detectors;and 11)devices monitoring any other secondary <br /> containment areas. <br /> - <br /> ...... ----- ... . <br /> - �►sP7/g l�IS� S40 <br /> V D <br /> NSA <br /> D1sP'�/� p►5���Z <br /> C�N Sit. <br /> f <br /> s <br /> Q� r rNCT <br /> O <br /> LEGEND <br />
The URL can be used to link to this page
Your browser does not support the video tag.