My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LINCOLN
>
1153
>
2300 - Underground Storage Tank Program
>
PR0231413
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2022 4:17:39 PM
Creation date
9/1/2020 3:10:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0231413
PE
2361
FACILITY_ID
FA0003122
FACILITY_NAME
QUIK STOP MARKET #3138
STREET_NUMBER
1153
STREET_NAME
LINCOLN
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
231-190-12
CURRENT_STATUS
01
SITE_LOCATION
1153 LINCOLN BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Recommended Practices for the Testing and Verification of Spill,Overfill,leak Detection and Secondary Containment Equipment at UST Facilities <br /> mary containment of secondarily contained spill <br /> bucket~. WARNING: Use only an air operated vacu <br /> um source or a vacuum pump powered by <br /> `w. 6.3.2 Description of Test. Using a specially an explosion-proof motor. Vacuum pumps <br /> equipped test cover;a partial vacuum is applied to with electric motors that are not explo- <br /> the spill bucket-The vacuum level is monitored for sion-proof may ignite flammable vapors. <br /> a 1-minute period. If a portable air compressor is used. it <br /> should be located at least 20 feet away <br /> 6.3.3 Test Equipment. Test equipment shall from the venturi-eductor or outside any <br /> include: Class I, Division 1 area. <br /> • Vacuum test apparatus (The test apparatus may <br /> be available from the spill bucket manufacturer. 6.3.4 Preparation. <br /> It includes an air pressure regulator, a vacuum <br /> source, a vacuum gauge with a minimum 0-50 1. Remove and properly dispose of any liquid and <br /> inch water column range and a control valve.The debris (leaves, sediment and trash) in the spill <br /> control valve is used to adjust the vacuum level.). hucket.Clean the spill bucket and examine it for <br /> • Test cover (The cover is equipped with a test damage,defects or improperly installiA compo- <br /> fitting.); nents. If there are loose components(e.g., loose <br /> band clamps or bolts),tighten these items before <br /> • Plumber's plug(appropriate size, if used); performing the integrity test if there are items <br /> • Stopwatch or other time-measurement device that must be repaired or replaced (e.g., detericz- <br /> capable of measuring a I-second increment; rated gaskets/seals or drain valves). notify the <br /> owner/operator to obtain approval before pro- <br /> • Gasketing material (The purpose of the gas- ceeding with the needed repairs. <br /> keting material is to provide an air-tight seal <br /> between the test cover and the spill bucket.). 2� Examine the fill cap and adapter fitting for <br /> loose, missing or damaged parts and make nec- <br /> N%ml essary repairs.Make sure that the seal on the fill <br /> o-50•water Column cap is present and in good condition. The cap <br /> Vacuum Vacuum Gauge must fit securely and be leak-tight on the riser. <br /> source _ i A leaking cap will result in a failed test. As an <br /> alternative to a tight fill cap. use a plumber's <br /> plug in the fill riser. <br /> control 3.The ill bucket drain if resent, must be <br /> Valve ucn valve, p <br /> leak-tight to pestis the test. if the drain valve is <br /> not leak-tight, it may be removed and perma- <br /> nently plugged. <br /> NOTE: Before permanently plugging, ensure <br /> Piurnber's Plug rn that local regulations allow the drain valve to <br /> Tank Riser Pipe be permanently plugged. <br /> 4.Clean any contamination from the top surface <br /> of the spill bucket where the cover makes a seal <br /> and line it with gasketing material. <br /> S.Place the test cover on the spill bucket,con- <br /> firming that it makes a tight seal with the Bas- <br /> keting material. <br /> FlGURE 6-2. The cover must make a tight seat with tate 6.Connect the line from the vacuum source to the <br /> spill bucket to prevent leakage when the vacuum is adapter on the cover. <br /> ti•-- pulled during the test. <br /> 7. If the spill bucket is found to have cracks, loose <br /> parts or separation of the bucket from the fill <br /> pei org <br />
The URL can be used to link to this page
Your browser does not support the video tag.