My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3425
>
2300 - Underground Storage Tank Program
>
PR0231416
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2020 3:43:35 PM
Creation date
9/1/2020 3:24:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0231416
PE
2361
FACILITY_ID
FA0003627
FACILITY_NAME
ARCO 02093
STREET_NUMBER
3425
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
21418020
CURRENT_STATUS
01
SITE_LOCATION
3425 TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB , January 2002 GR JOb# 18200927. 1 Page 2 of 2 <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By : [] Sump Manufacturer 0Industry Standard [] Professional Engineer <br /> 0 Other (Spec) <br /> Test Method Used : [] Pressure [] Vacuum []Hydrostatic <br /> ❑ Other (Spec) <br /> Test Equipment Used : INCON TS - STS Equipment Resolution : 0 . 0001 <br /> SOMME= Sump # 87 S Sump # 87 Sump # 87 Siphon Sump # 91 <br /> Sump Diameter: <br /> 4411 4411 4411 4411 <br /> Sump Depth : 55 " 54 " 53 " 54 " <br /> Sump Material : fiberglass fiberglass fiberglass fiberglass <br /> Height from Tank Top to Top of 2111 3311 35 " 2111 <br /> .Highest Piping Penetration : <br /> Height from Tank Top to Lowest 4111 3411 39 " 3911 <br /> Electrical Penetration: <br /> Condition of sump prior to testing: Fair Fair Fair Fair <br /> Portion of Sump Tested' 4611 4011 4511 4511 <br /> Does turbine shut down when 0 Yes ❑ No 0 NA <br /> sump sensor detects liquid (both 0 Yes 0 No DNA 0 Yes ❑ No ❑ NA [aYes []No UlA <br /> product and water),?* <br /> Turbine shutdown response time 6 sec 6 sec 6 sec 6 sec <br /> Is system programmed for fail-safe 0 Yes ❑ No ❑ NA 0 Yes 0 No ❑ NA 0 Yes ❑No ❑ NA 0 Yes ❑ No 0 NA <br /> shutdown? <br /> Was fail-safe verified to be 0 Yes 0 No ❑ NA 0 Yes 0 No ❑ NA 0 Yes 0 No 0 NA OYes ❑ No ❑ NA <br /> operational? * <br /> Wait time between applying <br /> pressure/vacuum/water and starting 15 mins 15 mins 15 mins 15 mins <br /> test: <br /> Test Start Time : 9 : 50 am 10a30 am 11 : 0 0 am 11 ; 29 am <br /> Initial Reading A) : 3 . 1795 5 . 2137 4 . 7504 4 . 0735 <br /> Test End Time : 10 : 05 10 : 45 11 : 15 11s44 <br /> Final Reading (RF) : 3 . 17 9 3 5 . 215 0 4 . 7 5 0 6 7 . 0 7 3 8 <br /> Test Duration: 15 mins 15 mins 15 mins 15 mins <br /> Change in Reading (RF-RI) : 0 . 0 0 0 2 0 . 0 013 000002 0 . 0 0 0 3 <br /> Pass/Fail Threshold or Criteria: 0 . 0 0 2 0 . 0 0 2 09002 0 . 0 0 2 <br /> Test Result: 0 Pass 0 Fail 01 Pass 0 Fail 0 Pass Mil 0 Pass 0 Fail <br /> Was sensor removed for testing? 0 Yes ❑ No ❑ NA OYes ONo ONA OYes []No ONA 0Yes 0 N 0 N <br /> Was sensor properly replaced and OYes ❑ No ONA (DYes ONo LINA ©Yes []No DNA OYes ❑ No ONA <br /> verified functional after testin ? <br /> Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> ' If the entire depth of the sump is not tested, specify how much was tested . If the answer to any of the questions indicated with an <br /> asterisk (* ) is "NO" or "NA", the entire sump must be tested . (See SWRCB LG- 160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.