My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3425
>
2300 - Underground Storage Tank Program
>
PR0231416
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2020 3:43:35 PM
Creation date
9/1/2020 3:24:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0231416
PE
2361
FACILITY_ID
FA0003627
FACILITY_NAME
ARCO 02093
STREET_NUMBER
3425
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
21418020
CURRENT_STATUS
01
SITE_LOCATION
3425 TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM (page s of s) <br /> :1 <br /> XII . LINE LEAK DETECTOR TESTING <br /> ❑ Check this box if line leak detectors ( LLD) are NOT installed (Do not Complete this section ) y N NA <br /> This section must be completed if LLDs are installed. <br /> Was a leak simulated to verity LLD performance? O ❑ ❑ <br /> (Check all that apply ) Simulated leak rate verified X❑ 3 GPH ❑ 0 1 GPM ❑ 0 2 GPH <br /> Was the testing apparatus properly calibrated? n ❑ ❑ <br /> For emergency generator tank systems does the LLD create an audible and visual alarm when a leak is detected ❑ ❑ X❑ <br /> For mechanical LLDs does the LLD restrict the flow through the pipe when a leak is detected ? ❑ ❑ X❑ <br /> For electronic LLDs does the turbine automatically shut off when a leak is detected ? ❑X ❑ ❑ <br /> For electronic LLDs does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? ❑X EJ ❑ <br /> For electronic LLDs . does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? ❑X ❑ ❑ <br /> For electronic LLDs have all accessible wiring connections been visually inspected for kinks and breaks? ❑X ❑ 1 ❑ <br /> Were all items on the equipment manufacturer s maintenance checklist completed ? ❑X ❑ 1 ❑ <br /> Were all LLDs confirmed operational within regulatory requirements ? Q 1 ❑ I ❑ <br /> For any answer of "M " above, describe in Section X111 how and when these issues were or will be corrected <br /> XIII . COMMENTS <br /> XIV. VACUUM i PRESSURE i HYDROSTATIC MONITORING EQUIPMENT TESTING <br /> ❑X Check this box if VPH monitoring is NOT used . (Do not complete this section. ) <br /> This section must be completed if VPN monitoring is used to perform leak detection monitoring. <br /> System Type (Mark all that apply.) ❑ Vacuum ❑ Pressure ❑ Hydrostatic <br /> Sensor ID Component(S) Monitored By This Sensor Sensor Functionality Interstitial Communication <br /> Test Test <br /> ❑ Pass ❑ Fa ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fa=t ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fal ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fal ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fad ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fast ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fal 1 11 Pass ❑ Fail <br /> ❑ Pass ❑ Fal ❑ Pass ❑ Fad <br /> ❑ Pass ❑ Fal ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Faa ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Faa ❑ Pass El 170 <br /> How was interstitial communication verified ' ❑ Simulated Leak at Far Ends of the Interstitial Space ❑ Visual inspection <br /> Other (Describe the method in section XV below ) Gauge <br /> Was the vacuum or pressure restored to operating levels in all interstitial spaces? ❑ Yes ❑ No (Describe the reason in section XV below ) <br /> For any answer of "Fail" above, describe in Section XV how and when these issues were or will be corrected. <br /> XV. COMMENTS <br /> GPH = Gallons Per Hour. Y = Yes N = No, NA = Not Applicable, VPH = Vac u miPressuml-lydrostatic: ID = Identification <br /> i <br /> l <br />
The URL can be used to link to this page
Your browser does not support the video tag.