My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3725
>
2300 - Underground Storage Tank Program
>
PR0231417
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2024 11:07:00 AM
Creation date
9/1/2020 3:45:06 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0231417
PE
2361
FACILITY_ID
FA0003780
FACILITY_NAME
TRACY SHELL
STREET_NUMBER
3725
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
21217030
CURRENT_STATUS
01
SITE_LOCATION
3725 N TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
157
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Recommended Practices for the Testing and Verification of Spill,Overfill,Leak Detection and Secondary Containment Equipment at UST Facilities <br /> • properly anchored to the dispenser box frame or 10.3.4 Test Equipment. None, this is a visual <br /> dispenser island; inspection. <br /> • shear section located between 1/2 inch above and 10.3.5 Test Procedure. <br /> 1/s inch below the level of the top surface of the <br /> dispenser island; 1.Inspect the vapor shear valve for proper <br /> installation and anchoring. The portion of the <br /> • lever arm free to rotate and able to snap the pop- shear valve located below the shear section <br /> pet valve shut/closed; must be rigidly anchored to the dispenser box <br /> • appropriate plug properly installed in the test frame or the concrete dispenser island using <br /> port; hardware and materials specifically designed <br /> for this purpose. The portion above the shear <br /> • no fuel flow from the dispensing nozzle when section must be rigidly mounted to the inside of <br /> the product shear valve is closed. the dispenser. If the shear valve is not properly <br /> If any one of the passing criteria noted above is not <br /> anchored, notify the appropriate person to have <br /> met,then the shear valve fails the test. it repaired. <br /> 10.3 Vapor Shear Valves. 2.Place the cover back on the dispenser and <br /> remove barricades. <br /> 10.3.1 Purpose. The purpose of this test and 10.3.6 Pass/Fall Criteria. If a vapor shear valve <br /> inspection is to verify that the vapor shear valves, meets all of the following criteria,it passes the test: <br /> if present,are properly installed per manufacturer's <br /> specification. • properly anchored to the dispenser box frame or <br /> dispenser island; <br /> 10.3.2 Description of Test. The vapor shear <br /> valve is inspected for proper installation per the shear section located between 1/z inch above and <br /> 1/i <br /> manufacturer. inch below the level of the top surface of the <br /> dispenser island. <br /> 10.3.3 Preparation. Barricade the entire dis- <br /> penser that is to be inspected and tested so that no If any one of the passing criteria noted above is not <br /> customers will attempt to pump fuel.Open the dis- <br /> penser cover to access the inside of the dispenser. <br /> pei.org 0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.