My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3725
>
2300 - Underground Storage Tank Program
>
PR0231417
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2024 11:07:00 AM
Creation date
9/1/2020 3:45:06 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0231417
PE
2361
FACILITY_ID
FA0003780
FACILITY_NAME
TRACY SHELL
STREET_NUMBER
3725
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
21217030
CURRENT_STATUS
01
SITE_LOCATION
3725 N TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
157
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
._ _... ---- - -- rte._ - -- - - - --- _ -----�•v <br /> Recommended Practices for the Testing and Verification of Spill,Overfill,Leak Detection and Secondary Containment Equipment at LIST Facilities <br /> 4.Reset the E-stop that was just tested. • all dispensing devices on all islands; <br /> S.Ensure that power has been reestablished to normal • all submersible pumps for all fuel grades that serve <br /> operating condition. dispensing devices; <br /> 6.Continue to test each E-stop switch at the entire facil- • all power, control and signal circuits associated with <br /> ity. the dispensing devices and the submersible pumps; <br /> 7.Once every E-stop switch has been tested for proper • all other non-intrinsically safe electrical equipment <br /> operation, ensure that power has been reestablished to in the classified areas surrounding fuel dispensing <br /> the entire facility and allow normal pumping opera- devices. <br /> tions to resume. <br /> If any one of the passing criteria noted above is not met, <br /> 11.7 Pass/Fail Criteria. If all E-stop switches/buttons then the E-stop switches buttons fail the test. <br /> disconnect power to the following,the system passes the <br /> test: <br /> pei.org <br />
The URL can be used to link to this page
Your browser does not support the video tag.