My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3725
>
2300 - Underground Storage Tank Program
>
PR0231417
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2024 11:07:00 AM
Creation date
9/1/2020 3:45:06 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0231417
PE
2361
FACILITY_ID
FA0003780
FACILITY_NAME
TRACY SHELL
STREET_NUMBER
3725
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
21217030
CURRENT_STATUS
01
SITE_LOCATION
3725 N TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
157
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Recommended Practices for the Testing and Verification of Spill,Overfill,Leak Detection and Secondary Containment Equipment at UST Facilities <br /> APPENDIX C-4 <br /> CONTAINMENT SUMP INTEGRITY TESTING <br /> HYDROSTATIC OD <br /> Facility Name: Owner: <br /> Address: Address: <br /> City,State,Zip Code: City,State,Zip Code: <br /> Facility I.D.#: Phone#: <br /> Testing Company. Phone#: Date: <br /> This procedure is to test the leak integrity of containment sumps.See PEI/RP1200 Section 6.5 for the test method, <br /> Containment Sump ID <br /> Containment Sump <br /> Material <br /> Liquid and debris ❑Yes ❑No ❑Yes ❑No ❑Yes ❑No ❑Yes ❑No ❑Yes ❑No ❑Yes ❑No <br /> removed from sump?* <br /> Visual Inspection(No <br /> cracks,loose parts ❑Pass ❑Fail ❑Pass ❑Fail ❑Pass ❑Fail ❑Pass ❑Fail ❑Pass ❑Fail ❑Pass ❑Fail <br /> or separation of the <br /> containment sump.) <br /> Containment Sump <br /> Depth <br /> Height From Bottom to <br /> Top of Highest <br /> Penetration <br /> Starting Water Level <br /> Test Start Time <br /> Ending Water Level <br /> Test End Time <br /> Test Period(Minimum <br /> test time:1 hour) <br /> Water Level Change <br /> Pass/fail criteria:Must pass visual inspection.Water level drop of less than 1/8 inch. <br /> Test Results ❑Pass ❑Fail ❑Pass ❑Fail ❑Pass ❑Fail ❑Pass ❑Fail ❑Pass ❑Fail ❑Pass ❑Fail <br /> Comments: <br /> *All liquids and debris must be disposed of properly. <br /> Tester's Name(print) Tester's Signature <br /> pei.org <br />
The URL can be used to link to this page
Your browser does not support the video tag.