My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3725
>
2300 - Underground Storage Tank Program
>
PR0231417
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2024 11:07:00 AM
Creation date
9/1/2020 3:45:06 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0231417
PE
2361
FACILITY_ID
FA0003780
FACILITY_NAME
TRACY SHELL
STREET_NUMBER
3725
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
21217030
CURRENT_STATUS
01
SITE_LOCATION
3725 N TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
157
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Recommended Practices for the Testing and Verification of Spill,Overfill,Leak Detection and Secondary Containment Equipment at UST Facilities <br /> APPENDICES <br /> Appendix A: FISP Tank Manufacturers' Test Checklists/Data Logs............................................................39 <br /> Appendix A-1: Containment Solutions..................................................................................................................................40 <br /> AppendixA-2:Xerxes..................................................•.------------•--............_......................................----..................................41 <br /> Appendix B: Pressure and Vacuum Conversion Tables...............................................................................43 <br /> Table B-1:Pressure Conversions...........................................................................................................................................43 <br /> Table B-2:Vacuum Conversions—Inches Water Column...................................................................................................43 <br /> TableB-3:Vacuum Conversions—In Hg............................................................................................................................44 I <br /> i <br /> AppendixC: Sample Test Data Sheets.....................................................................................................45 <br /> Appendix C-1:Tank Secondary Containment Integrity Testing Dry Test Method...............................................................46 <br /> Appendix C-2:Piping Secondary Containment Integrity Testing...............................................................................:.........47 <br /> Appendix C-3:Spill Bucket Integrity Testing Hydrostatic Test Method Single-and <br /> Double-Walled Vacuum Test Method........................................................................................................................48 <br /> Appendix C-4: Containment Sump Integrity Testing Hydrostatic Testing Method..............................................................49 <br /> Appendix C-5:UST Overfill Equipment Inspection Automatic Shutoff Device and Ball Float Valve................................50 <br /> Appendix C-6:Overfill Alarm Operation Inspection....................................................... ....51 <br /> ................................................. <br /> Appendix C-7:Automatic Tank Gauge Operation Inspection...............................................................................................52 <br /> Appendix C-8:Liquid Sensor Functionality Testing.............................................................................................................53 <br /> Appendix C-9:Mechanical and Electronic Line Leak Detectors Performance Tests...........................................................54 <br /> Appendix C-10: Shear Valve Operation Inspection...............................................................................................................55 <br /> Appendix C-11: Emergency Stop Switch Operation Inspection...........................................................................................56 <br /> AppendixD: Publication Reference..........................................................................................................57 <br /> pei.org 0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.