My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
V
>
VERNALIS
>
9000
>
2200 - Hazardous Waste Program
>
PR0541637
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2020 10:19:34 AM
Creation date
9/1/2020 3:48:36 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0541637
PE
2226
FACILITY_ID
FA0009758
FACILITY_NAME
SFPUC Tesla Treatment Facility
STREET_NUMBER
9000
Direction
W
STREET_NAME
VERNALIS
STREET_TYPE
Rd
City
Tracy
Zip
95377
CURRENT_STATUS
01
SITE_LOCATION
9000 W Vernalis Rd
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1534 Willow Pass Road,Pittsburg,CA 94565-1701 <br /> M c C a m p b e I l Analytical, Inc. Toll Free Telephone:(877)252-9262/Fax:(925)252-9269 <br /> "When Quality Counts" http://www.mccampbef.com/E-mail:main@mccampbell.com <br /> WORK ORDER SUMMARY <br /> Client Name: AEW ENGINEERING,INC. Project: 2018-035;Tesla Hg Clean up Work Order: 1901522 <br /> Client Contact: Randy Young QC Level: LEVEL 2 <br /> Contact's Email: ryoung@aeweng.com Comments:Hold all soil samples for 6mos per Ken Leung 3/14/14 Date Logged: 1/14/2019 <br /> ❑WaterTrax ❑WriteOn EDF 0 Excel ❑EQuIS 0 Email E]HardCopy ❑ThirdParty ❑J-flag <br /> Lab ID Client ID Matrix Test Name Containers Bottle&Preservative De- Collection Date TAT Sediment Hold SubOut <br /> /Composites chlorinated &Time Content <br /> 1901522-OOIA Trench Conf. 1/14/19 Water E200.8(Metals)(Dissolved-Lab 1 250mL HDPE,unprsv. F-1 1/14/2019 9:15 1 day Present F-1 <br /> Filtered)<Mercury> <br /> 1901522-002A Sump Conf. 1/14/19 Water E200.8(Metals)(Dissolved-Lab 1 250mL HDPE,unprsv. ❑ 1/14/2019 10:15 1 day Present 71 <br /> Filtered)<Mercury> <br /> 1901522-003A Hose Flush 1/14/19 Water E200.8(Metals)(Dissolved-Lab 1 250mL HDPE,unprsv. 1/14/2019 11:10 1 day Present <br /> Filtered)<Mercury> <br /> NOTES: - STLC and TCLP extractions require 2 days to complete; therefore, all TATs begin after the extraction is completed (i.e., One-day TAT yields results <br /> in 3 days from sample submission). <br /> - MAI assumes that all material present in the provided sampling container is considered part of the sample - MAI does not exclude any material from <br /> the sample prior to sample preparation unless requested in writing by the client. <br /> Page 1 of 1 <br /> Page 7 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.