Laserfiche WebLink
CERS Consolidated Emergency Response / Contingency Plan <br /> INTERNAL FACILITY EMERGENCY COMMUNICATIONS OR ALARM NOTIFICATION WILL OCCUR BY (Check all that apply): C11 ' <br /> [D1 . VERBAL WARNINGS; ❑ 2. PUBLIC ADDRESS OR INTERCOM SYSTEM; F1 3 . TELEPHONE; <br /> ❑ 4 . PAGERS ; ❑' 5 . ALARM SYSTEM; ❑ 6. PORTABLE RADIO <br /> NOTIFICATIONS TO NEIGHBORING FACILITIES THAT MAY BE AFFECTED BY AN OFF-SITE RELEASE WILL OCCUR BY (Check all that apply): <br /> C12. <br /> ❑' 1 . VERBAL WARNINGS; ❑ 2. PUBLIC ADDRESS OR INTERCOM SYSTEM; 3 . TELEPHONE; <br /> ❑ 4. PAGERS ; I ❑ 5 . ALARM SYSTEM; ❑ 6. PORTABLE RADIO <br /> EMERGENCY COORDINATOR CONTACT INFORMATION: Metal Finishing Solutions, Inc. - Site General Manager Cla. <br /> PRIMARY EMERGENCY COORDINATOR NAME: Corey dehl PHONE NO. : (925) 872- 1263 PHONE NO. : <br /> ALTERNATE EMERGENCY COORDINATOR NAME: Tony Gdzelj PHONE NO. : (408) 727-6633 PHONE NO. : (408) 569=5292 <br /> ❑ Check if additional Emergency Coordinator contact and address information is available onsite or by calling PHONE NO. : <br /> Note: If more than one alternate emergency coordinator is designated, attach a list in order of responsibility . <br /> D . EMERGENCY CONTAINMENT AND CLEANUP PROCEDURES <br /> Check the applicable boxes to indicate your facility 's procedures for containin& spills and preventing and mitigating releases, fires and/or explosions. Dl . <br /> I Q 1 , MONITOR FOR LEAKS, RUPTURES, PRESSURE BUILD-UP, ETC. ; <br />( 2 . PROVIDE STRUCTURAL PHYSICAL BARRIERS (e. g., Portable spill containment walls, built-in berms); <br /> [.] 3 . PROVIDE ABSORBENT PHYSICAL BARRIERS (e.g. , Pads, spill pigs, spill pillows); <br /> 4. COVER OR BLOCK FLOOR AND/OR STORM DRAINS, <br /> 5. LINED TRENCH DRAINS AND/OR SUMPS; <br /> 6, AUTOMATIC FIRE SUPPRESSION SYSTEM; <br /> ❑ 7. ELIMINATE SOURCES OF IGNITION FOR FLAMMABLE HAZARDS ; <br /> Q 8. STOP PROCESSES AND/OR OPERATIONS ; <br /> 9. AUTOMATIC / ELECTRONIC EQUIPMENT SHUT-OFF SYSTEM; <br /> [j 10. SHUT OFF WATER, GAS, ELECTRICAL UTILITIES; <br /> Q 11 . CALL 9- 1 - 1 FOR PUBLIC EMERGENCY RESPONDER ASSISTANCE AND/OR MEDICAL AID; <br /> Q 12. NOTIFY AND EVACUATE PERSONS IN ALL THREATENED AND/OR IMPACTED AREAS; <br /> 13 . ACCOUNT FOR EVACUATED PERSONS IMMEDIATELY AFTER EVACUATION, <br /> ❑ 14. PROVIDE PROTECTIVE EQUIPMENT FOR ON-SITE EMERGENCY RESPONSE TEAM; <br /> 0 15, REMOVE CONTAINERS AND/OR ISOLATE AREAS ; <br /> El 16, HIRE LICENSED HAZARDOUS WASTE CONTRACTOR; <br /> no 17. USE ABSORBENT MATERIAL FOR SPILL CONTAINMENT; <br /> El 18, VACUUM SUCTION USING APPROPRIATE VACUUM (e.g. , Intrinsically safe) FOR SPILL CONTROL AND/OR CLEANUP; <br /> no 19. DECONTAMINATE PERSONNEL AND EQUIPMENT WITHIN DESIGNATED AREA AND DISPOSE OF WASTEWATER AS HAZARDOUS WASTE; <br /> M 20. PROVIDE SAFE TEMPORARY STORAGE OF HAZARDOUS WASTE GENERATED DURING EMERGENCY ACTIONS; <br /> D2. <br /> ❑ 21 . OTHER (Specify): <br /> E. FACILITY EVACUATION <br /> THE FOLLOWING ALARM SIGNAL(S) WILL BE USED TO BEGIN EVACUATION OF THE FACILITY (Check all that apply): El , <br /> E2 <br /> 1 . BELLS; <br /> ❑ 2. HORNS/SIRENS ; <br /> no 3 . VERBAL (i.e. , Shouting); <br /> ❑ 4. OTHER (Specify): E3. <br /> THE FOLLOWING LOCATION(S) WILL BE USED FOR AN EMERGENCY ASSEMBLY AREA(S) (e.g. , Parking lot, street corner): <br /> Front parking lot on EI Pinal Drive <br /> Note: The Emergency Coordinator must account for all onsite employees and visitors after evacuation. <br /> EVACUATION ROUTE S AND ALTERNATE EVACUATION ROUTES ARE DESCRIBED AS FOLLOWS : <br /> ❑ 1 . WRITTEN PROCEDURES DESCRIBING ROUTES, EXITS, AND ASSEMBLY AREAS; <br /> 2, EVACUATION MAP(S) DEPICTING ROUTES, EXITS, AND ASSEMBLY AREAS; <br /> Es. <br /> ❑ 3 . OTHER (Specify): <br /> Note: Evacuation procedures and/or maps should be posted in visible facility locations and must be included in the Contingency Plan, <br /> F. ARRANGEMENTS FOR EMERGENCY SERVICES <br /> ADVANCE ARRANGEMENTS FOR LOCAL EMERGENCY SERVICES (Check one of the following): Fl . <br /> Q 1 . HAVE BEEN DETERMINED NOT NECESSARY; <br /> F2. <br /> ❑ 2. THE FOLLOWING ARRANGEMENTS HAVE BEEN MADE (Specify): <br /> Note: Advance arrangements with local fire and police departments, hospitals, state and local emergency response teams, and/or emergency services <br /> contractors should be made for your facility, if necessary. Large Quantity Generators must describe arrangements in the Contingency Plan. <br /> Rev. 03/07/17 Page 2 of 4 <br />