Laserfiche WebLink
CERS Consolidated Emergency Response / Contingency Plan <br /> INTERNAL FACILITY EMERGENCY COMMUNICATIONS OR ALARM NOTIFICATION WILL OCCUR BY (Check all that apply): ct 1 . <br /> ❑' 1 . VERBAL WARNINGS; ❑ 2. PUBLIC ADDRESS OR INTERCOM SYSTEM; ❑ 3 . TELEPHONE; <br /> ❑ 4 . PAGERS; ❑' 5. ALARM SYSTEM; ❑ 6. PORTABLE RADIO <br /> NOTIFICATIONS TO NEIGHBORING FACILITIES THAT MAY BE AFFECTED BY AN OFF-SITE RELEASE WILL OCCUR BY (Check all that apply): Cie. <br /> ❑o 1 . VERBAL WARNINGS; ❑ 2. PUBLIC ADDRESS OR INTERCOM SYSTEM; Q 3 . TELEPHONE; <br /> ❑ 4. PAGERS; ❑ 5 . ALARM SYSTEM; ❑ 6. PORTABLE RADIO <br /> EMERGENCY COORDINATOR CONTACT INFORMATION: Metal Finishing Solutions, Inc. - Site General Manager c13. <br /> PRIMARY EMERGENCY COORDINATOR NAME: Corey dehl PHONE NO. : (925) 872- 1263 PHONE NO. : <br /> ALTERNATE EMERGENCY COORDINATOR NAME: Tony Gdzelj PHONE NO. : (408) 727-6633 PHONE NO. : (408) 569-5292 <br /> ❑ Check if additional Emergency Coordinator contact and address information is available onsite or by calling PHONE NO. : <br /> Note: If more than one alternate emergency coordinator is designated, attach a list in order of responsibility. <br /> D . EMERGENCY CONTAINMENT AND CLEANUP PROCEDURES <br /> Check the applicable boxes to indicate your facility 's procedures for containing spills and preventing and mitigating releases, fires and/or explosions, <br /> 131 . <br /> 1 . MONITOR FOR LEAKS, RUPTURES , PRESSURE BUILD-UP, ETC. ; <br /> 2 , PROVIDE STRUCTURAL PHYSICAL BARRIERS (e. g., Portable spill containment walls, built-in berms); <br /> 3 . PROVIDE ABSORBENT PHYSICAL BARRIERS (e.g. , Pads, spill pigs, spill pillows); <br /> Q 4, COVER OR BLOCK FLOOR AND/OR STORM DRAINS; <br /> 5. LINED TRENCH DRAINS AND/OR SUMPS; <br /> no 6. AUTOMATIC FIRE SUPPRESSION SYSTEM; <br /> ❑ 7. ELIMINATE SOURCES OF IGNITION FOR FLAMMABLE HAZARDS ; <br /> ❑' 8. STOP PROCESSES AND/OR OPERATIONS; <br /> ❑o 9. AUTOMATIC / ELECTRONIC EQUIPMENT SHUT-OFF SYSTEM; <br /> [j] 10. SHUT OFF WATER, GAS, ELECTRICAL UTILITIES; <br /> no I L CALL 9- 1 - 1 FOR PUBLIC EMERGENCY RESPONDER ASSISTANCE AND/OR MEDICAL AID, <br /> [j] 12 . NOTIFY AND EVACUATE PERSONS IN ALL THREATENED AND/OR IMPACTED AREAS; <br /> n 13 . ACCOUNT FOR EVACUATED PERSONS IMMEDIATELY AFTER EVACUATION; <br /> ❑ 14. PROVIDE PROTECTIVE EQUIPMENT FOR ON-SITE EMERGENCY RESPONSE TEAM; <br /> n 15. REMOVE CONTAINERS AND/OR ISOLATE AREAS ; <br /> Q 16, HIRE LICENSED HAZARDOUS WASTE CONTRACTOR; <br /> 17. USE ABSORBENT MATERIAL FOR SPILL CONTAINMENT; <br /> 18, VACUUM SUCTION USING APPROPRIATE VACUUM (e.g. , Intrinsically safe) FOR SPILL CONTROL AND/OR CLEANUP; <br /> 19, DECONTAMINATE PERSONNEL AND EQUIPMENT WITHIN DESIGNATED AREA AND DISPOSE OF WASTEWATER AS HAZARDOUS WASTE; <br /> 20. PROVIDE SAFE TEMPORARY STORAGE OF HAZARDOUS WASTE GENERATED DURING EMERGENCY ACTIONS; <br /> ❑ 21 . OTHER (Specify): D2. <br /> E. FACILITY EVACUATION <br /> THE FOLLOWING ALARM SIGNAL(S) WILL BE USED TO BEGIN EVACUATION OF THE FACILITY (Check all that apply): E1 . <br /> 1 . BELLS; <br /> E2. <br /> ❑ 2. HORNS/SIRENS; <br /> 3 . VERBAL (i . e. , Shouting); <br /> ❑ 4. OTHER (Specify): <br /> THE FOLLOWING LOCATION(S) WILL BE USED FOR AN EMERGENCY ASSEMBLY AREA(S) (e. g. , Parking lot, street comer): E3. <br /> Front parking lot on EI Pinal Drive <br /> Note : The Emergency Coordinator must account for all onsite employees and visitors after evacuation. <br /> EVACUATION ROUTE S AND ALTERNATE EVACUATION ROUTES ARE DESCRIBED AS FOLLOWS : E4• <br /> ❑ 1 . WRITTEN PROCEDURES DESCRIBING ROUTES, EXITS, AND ASSEMBLY AREAS ; <br /> ❑� 2. EVACUATION MAP(S) DEPICTING ROUTES, EXITS, AND ASSEMBLY AREAS; <br /> ❑ 3 . OTHER (Specify): Es. <br /> Note: Evacuation procedures and/or maps should be posted in visible facility locations and must be included in the Contingency Plan . <br /> F . ARRANGEMENTS FOR EMERGENCY SERVICES <br /> ADVANCE ARRANGEMENTS FOR LOCAL EMERGENCY SERVICES (Check one of the following): F1 <br /> Q 1 . HAVE BEEN DETERMINED NOT NECESSARY; <br /> ❑ 2. THE FOLLOWING ARRANGEMENTS HAVE BEEN MADE (Specify): F2. <br /> Note: Advance arrangements with local fire and police departments, hospitals, state and local emergency response teams, and/or emergency services <br /> contractors should be made for your facility, if necessary. Large Quantity Generators must describe arrangements in the Contingency Plan , <br /> Rev. 03/07/17 Page 2 of 4 <br /> C <br />