Laserfiche WebLink
Metal Finishing Solutions Inc . <br /> Flow Monitoringndard <br /> Sta <br /> 1 . Inspect Flume for any blockage, leaks, debris, foam or any and all Deviation from typical <br /> condition/function . <br /> 2 . Check PH and Flow charts on wall for any drop/spike in pH or high flow . pH parameters are to be <br /> within 5 . 040 .0 and flow should never increase 14 gallons per minute as 15 GPM is the cut-off. <br /> 3 . Observe sampler is running but pressing "Status" button on interface, " Program Running" <br /> Should be highlighted on top of screen . <br /> 4 . Check anti -foam solution pail is full and dosing pump in functioning order . <br /> 5 . Perform this twice Mid-shift and once again towards end of shift . <br /> Upon signing this document, the employee acknowledges and understands all aspects and requirements <br /> of the task and responsibilities cited above . Andy and all discrepancies to be reported immediately to <br /> Corey Dehl . <br /> ( Sign/ Printz. ® LAY bEHL <br /> ( Date ) <br />