My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL PINAL
>
1325
>
2200 - Hazardous Waste Program
>
PR0543517
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2020 7:40:47 PM
Creation date
9/1/2020 3:51:31 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0543517
PE
2247
FACILITY_ID
FA0024706
FACILITY_NAME
METAL FINISHING SOLUTIONS - STOCKTON CA
STREET_NUMBER
1325
STREET_NAME
EL PINAL
STREET_TYPE
DR
City
STOCKTON
Zip
95205
CURRENT_STATUS
01
SITE_LOCATION
1325 EL PINAL DR STE 1
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
422
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Closing Drums & Other Containers Properly US DOT Guidance , <br /> United States Department of Transportation regulations state that packaging manufacturers are <br /> required to notify each person to whom the packaging is transferred of all requirements not met at the <br /> time of transfer. This requirement is given in Title 49 , Code of Federal Regulations (49 CFR ) , Part 178 <br /> Specifications for Packagings , § 178 . 2 ( c) . In addition this Paragraph requires the closing information <br /> to be provided to any person to whom this package is transferred who may need to close the packaging <br /> prior to re - shipment . Furthermore , it is the shipper ' s responsibility as set forth in § 173 . 22 ( a ) (4 ) to ensure <br /> that these closing instructions are carried out as described . In order to ensure the instructions are <br /> followed in a manner to result in safe transport of hazardous materials the shipper is obligated , as set <br /> forth in § 172 . 704 ( a ) (4 ) , namely - function specific training - to train his/ her employees in the correct <br /> way to close the packaging for shipment . In order to fulfill this obligation the shipper often turns to the <br /> packaging manufacturer for this training since the manufacturer has designed , produced and tested the <br /> packaging to meet UN performance standards . Mauser is prepared to provide this training in addition to <br /> supplying closing instructions . It has been the practice of Mauser to send closing instructions attached <br /> to the shipping documents with each shipment of drums . Below is some specific information on closing <br /> Mauser packagings . <br /> The following tables and text give examples of the parts and closing torque required to prepare the <br /> drum or IBC for shipment so that it is capable of meeting the performance standards indicated by <br /> the UN marking on the side of the packaging . Mauser recommends that only parts that have been <br /> tested and certified by Mauser be used to close the packagings for shipment . Each closure is supplied <br /> with the proper gasket in accordance with the UN design type tests for the packaging supplied . In <br /> the case of removable head drums the lids , gaskets and locking rings are supplied as tested . In the <br /> case of Intermediate Bulk Containers , IBC ' s , the lid , gaskets , plugs , cages , pallets , valves and service <br /> equipment are supplied as tested . <br /> Pictures of the plugs , lids and rings may be found on the website under products and services/ <br /> accessories . If a specific closure is not listed on the website or your specific closure is not listed below, <br /> please contact Mauser Corp for assistance . <br /> PRIOR TO CLOSING . <br /> Inspect each closure to ensure that the closure has the proper gasket and that both closure and <br /> gasket are in good condition . Inspect the sealing surface for damage and make sure the threads <br /> and sealing surfaces are dry. <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.