My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL PINAL
>
1325
>
2200 - Hazardous Waste Program
>
PR0543517
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2020 7:40:47 PM
Creation date
9/1/2020 3:51:31 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0543517
PE
2247
FACILITY_ID
FA0024706
FACILITY_NAME
METAL FINISHING SOLUTIONS - STOCKTON CA
STREET_NUMBER
1325
STREET_NAME
EL PINAL
STREET_TYPE
DR
City
STOCKTON
Zip
95205
CURRENT_STATUS
01
SITE_LOCATION
1325 EL PINAL DR STE 1
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
422
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MORRIS <br /> SHAFFER <br /> E N G I N E E R I N G Page 14 of 15 <br /> Tank Assessment Checklist : FN - T2 DI Neutralization Stage 2 <br /> Tank Name: FN- T2 DI Neutralization Stage 2 <br /> FApproximate Date of Construction : 2018 <br /> Design Standards: j Industry Practice at time of original construction <br /> Approx_imate Dimensions: �64" diameter by 69 " Height to Top of Vertical Wal <br /> Tank Configuration: }VVertical Flat Bottom Tank _ <br /> Approximate Gross Capacity: 1000 Gallons <br /> FMaterial of Construction : Polyethylene <br /> Approximate Tank Wall Thickness: 3/8" <br /> --- <br /> Tank System Piping: FPVC iping <br /> P <br /> Internal / External Pumps:-- , External pumps <br /> Leak Detection Equipment: Visual Observation <br /> Corrosion Protection Equipment: Fk A <br /> Spill Prevention Equipment: Anchor Cables <br /> _ -- ---- <br /> Secondary Containment: Epoxy-coated concrete berm <br /> Hazardous Characteristics of Waste : FAcidic wastewater <br /> FDescription of Structural Damage : The cylindrical tank was visible on all sides and did not show any <br /> signs of damage. The inside of the tank was not observed. The tank <br /> is new and appeared to be in good order. <br /> Results of Leak Test: No leak test was performed but tank was in use during our visa. No <br /> [visual signs of leaking were present <br /> Foundation : Tank installed on an epoxy-coated concrete slab -on -grade. There <br /> [were no signs of settlement around the tank. <br /> Seismic Anchors : 7ak <br /> nchor brackets areanchored to the epoxy- coated concrete <br /> rade. Stainless steel cables are attached to the top of the <br /> and wrap around the top of the tank. <br /> Estimated Remaining Service Life % I�-25+ ears <br /> - y <br /> Comments: This tank is new and appears to be in good condition. <br /> I <br /> 1300 INDUSTRIAL ROAD , SUITE 14, SAN CARLOS , CA 94070, ( 650 ) 595-2973 FAX ( 650 ) 595-2980 <br />
The URL can be used to link to this page
Your browser does not support the video tag.