My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL PINAL
>
1325
>
2200 - Hazardous Waste Program
>
PR0543517
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2020 7:40:47 PM
Creation date
9/1/2020 3:51:31 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0543517
PE
2247
FACILITY_ID
FA0024706
FACILITY_NAME
METAL FINISHING SOLUTIONS - STOCKTON CA
STREET_NUMBER
1325
STREET_NAME
EL PINAL
STREET_TYPE
DR
City
STOCKTON
Zip
95205
CURRENT_STATUS
01
SITE_LOCATION
1325 EL PINAL DR STE 1
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
422
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CLOSURE PLAN <br /> Closure Cost Estimate — Metal Finishing Solutions <br /> FTUs — Total Closure Cost <br /> 1325 e) Pinal Drive, Stockton CA 95205 <br /> ( Date : 7/28/2020) <br /> For Year 2020 <br /> No . Closure Procedure / Item lQuantilty Unit Cost TotaCost <br /> 1 Removal, treatment (on-site or off-site ) , or hrs . 50 . 00 250 <br /> disposal of waste inventories <br /> 2 Removal and disposal of soil 0 hrs . 50 .00 0 <br /> 3 Decontamination of equipment and structure 1 500 . 00 500 <br /> 4 Demolition and removal of containment 11 6750 . 00 6750 <br /> system components or structure <br /> 5 Transportation 1 250 . 00 3912 <br /> 6 Sampling and analysis of waste, soil, 1 1000 . 00 1000 <br /> equipment, and structure <br /> 7 Certification or other demonstration of 103 250 . 00 2500 <br /> closure ( "clean" closure or specified level of <br /> decontamination ) — Closure Report <br /> 8 Other expenses ( specify) 14 900 900 <br /> Permit fees <br /> 9 Less Assets ( salvage value of waste, 02 0 0 <br /> equipment or property) <br /> FTUs Closure Total $ 150812 <br /> 1 - Cost of 20 yards non RCRA contaminated Haz Waste bin transported and disposed of at Buttonwillow, CA — Nov 6, 2017 <br /> 2 - Per IES, $0 salvage value for used treatment equipment. Equipment to be properly disposed of as non RCRA Haz Waste. <br /> 3 - Adjusted to 10 hours to prepare FTU closure report — IES estimate <br /> 4 — fee cost estimate per Fremont FD permit adjusted to FTU closure fees for FTU closures <br /> Closure Cost Adjustments <br /> U .S. Dept . of Commerce Inflation Factor) <br /> Year Factor Adjusted Total Cost <br /> 2018 1 .0 $ 15, 812 <br /> 2019 1 . 03 $ 16, 286 <br /> 2020 1 .021 $ 16, 628 <br /> Metal Finishing Solutions, Inc. ( revised 7/28/2020) <br />
The URL can be used to link to this page
Your browser does not support the video tag.