My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0082168
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KLO
>
228
>
4200 – Liquid Waste Program
>
SR0082168
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2024 1:32:50 PM
Creation date
9/1/2020 4:03:44 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4200 – Liquid Waste Program
RECORD_ID
SR0082168
PE
4201 - LIQUID WASTE PLAN CHECK
STREET_NUMBER
228
Direction
W
STREET_NAME
KLO
City
LATHROP
Zip
95330
APN
19124018
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
228 W KLO LATHROP 95330
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Recommendations of the On -Site Wastewater Treatment Systems <br />Nitrogen Reduction Technology Expert Review Panel February 2014 <br />3.9.7 <br />Review Timeline and Recommendations <br />65 <br />3.10 Elevated <br />Sand Mounds................................................................................................................ <br />66 <br />3.10.1 <br />Detailed Definition of Practice <br />66 <br />3.10.2 <br />Nitrogen Load Reduction and Recommended Credit <br />66 <br />3.10.3 <br />Ancillary Issues and Interactions with Other Practices <br />72 <br />3.10.4 <br />Design and Installation Criteria <br />72 <br />3.10.5 <br />Temporal Performance <br />73 <br />3.10.6 <br />Recommended Management Requirements <br />73 <br />3.10.7 <br />Review Timeline and Recommendations <br />74 <br />3.11 Permeable Reactive Barriers....................................................................................................... <br />74 <br />3.11.1 <br />Detailed Definition of Practice <br />74 <br />3.11.2 <br />Nitrogen Load Reduction and Recommended Credit <br />75 <br />3.11.3 <br />Ancillary Issues and Interactions with Other Practices <br />77 <br />3.11.4 <br />Design and Installation Criteria <br />77 <br />3.11.5 <br />Temporal Performance <br />78 <br />3.11.6 Recommended Management Requirements 79 <br />3.11.7 Review Timeline and Recommendations 79 <br />4 Examples........................................................................................................................................80 <br />5 Future Research and Management Recommendations................................................................. 81 <br />5.1 Alkalinity Control....................................................................................................................... 81 <br />5.2 BMP Sampling............................................................................................................................ 81 <br />5.3 Data Sharing and Reciprocity..................................................................................................... 81 <br />5.4 Variable Baseline and BMP Performance by Soil Type............................................................. 82 <br />6 References........................................................................................................................................83 <br />Tables <br />Table ES -1-1. Summary of BMP Recommendations for Ex Situ Unit Processes ....................................... 11 <br />Table ES- 1-2. Summary of BMP Recommendations for In Situ Soil Treatment Unit Processes ............... 12 <br />Table ES -1-3. Summary of Net TN Load Reductions for Combined In Situ and Ex Situ Systems............ 13 <br />Table 1-1. List of OWTS Panelists.............................................................................................................14 <br />Table 2-1. TN Concentration for Various Design Flow Assumptions........................................................ 19 <br />Table 3-1. Summary of BMP Recommendations for Ex Situ Unit Processes ............................................. 29 <br />Table 3-2. Summary of BMP Recommendations for In Situ Soil Treatment Unit Processes ..................... 31 <br />Table 3-3. Summary of Net TN Load Reductions for Combined In Situ and Ex Situ Systems .................. 31 <br />O TETM.McKwc. <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.