My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL PINAL
>
1325
>
2231-2238 – Tiered Permitting Program
>
PR0543720
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2021 11:39:23 AM
Creation date
9/1/2020 4:29:13 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2231-2238 – Tiered Permitting Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0543720
PE
2231
FACILITY_ID
FA0024706
FACILITY_NAME
METAL FINISHING SOLUTIONS - STOCKTON CA
STREET_NUMBER
1325
STREET_NAME
EL PINAL
STREET_TYPE
DR
City
STOCKTON
Zip
95205
CURRENT_STATUS
01
SITE_LOCATION
1325 EL PINAL DR STE 1
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
569
PDF
View images
View plain text
SAN J O A g U I N Environmental Health Department <br /> CC LJ N T Y------- <br /> Permit By Rule Treatment Facility Inspection Report <br /> Facility Name: Facility Address: Date: <br /> METAL FINISHING SOLUTIONS-STOCKTON 1 1325 EL PINAL DR, STOCKTON August 31, 2020 <br /> SUMMARY OF VIOLATIONS <br /> (CLASS I,CLASS II,or MINOR-Notice to Comply) <br /> Item# Remarks <br /> (3)tank system secondary containment shall be provided with a leak detection system that is designed and <br /> operated so that it will detect either the failure of the primary and secondary containment structure or any release of <br /> hazardous waste or accumulated liquid in the secondary containment system within 24 hours, or at the earliest <br /> practicable time if the existing detection technology or site conditions will not allow detection of a release within 24 <br /> hours. <br /> Title 22 California Code of Regulations section 66265.193(f) <br /> (f)Ancillary equipment shall be provided with full secondary containment(e.g., trench,jacketing, double-walled <br /> piping)that meets the requirements of subsections (b)and (c)of this section except for: <br /> (1)aboveground piping (exclusive of flanges,joints, valves, and connections)that are visually inspected for leaks on <br /> a daily basis; <br /> (2)welded flanges,welded joints, and welded connections that are visually inspected for leaks on a daily basis; <br /> (3)sealless or magnetic coupling pumps and sealless valves,that are visually inspected for leaks on a daily basis; <br /> and <br /> (4)pressurized aboveground piping systems with automatic shut-off devices(e.g., excess flow check valves,flow <br /> metering shutdown devices, loss of pressure actuated shut-off devices)that are visually inspected for leaks on a <br /> daily basis. <br /> CORRECTIVE ACTION: Have a qualified Professional Engineer update the tank assessment and add the missing <br /> sections. Provide a corrective action statement and supporting documentation to the San Joaquin County <br /> Environmental Health Department(EHD)within 30 days. Provide a copy of the updated assessment,when <br /> available. <br /> This is a Class II violation. <br /> FA0024706 PR0543720 SCO01 08/31/2020 <br /> EHD 22-04 Rev.9/20/2019 Page 7 of 14 Permit By Rule Treatment Facility OIR <br /> 1868 E. Hazelton Avenue I Stockton, California 95205 1 T 209 468-3420 1 F 209 464-0138 1 www.sjcehd.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).