My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
505
>
2300 - Underground Storage Tank Program
>
PR0231442
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/3/2020 11:19:27 AM
Creation date
9/2/2020 2:50:00 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0231442
PE
2361
FACILITY_ID
FA0006441
FACILITY_NAME
QUIK STOP MARKET #5124*
STREET_NUMBER
505
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
217-260-21
CURRENT_STATUS
01
SITE_LOCATION
505 N MAIN ST
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PENN <br /> there are items that must be repaired or replaced 6 . 5 . 6 Test Procedure. <br /> (e .g . , deteriorated penetration fitting boots ), 1, Begin the test by adding water to the sump to a <br /> notify the owner/operator and obtain approval mini <br /> prior to proceeding with repairs. mum of 4 inches above the highest swap <br /> penetration or sump sidewall scam , whichever is <br /> 4. Test boots or secondary containment termina- higher. To compensate for sump deflection , the <br /> tion fittings must be present on the piping pen- water must be allowed to settle a minimum of <br /> Orating the sump. During testing , these fittings 15 minutes before taking the initial test measure- <br /> prevent water from entering the interstitial space ment, If the highest sump penetration or sump <br /> of double-walled piping. Without these fittings, sidewall seam is less than 4 inches from the top <br /> the integrity of the sump cannot be tested using of the sump, add water to within 1 inch of the <br /> this method . top of the sump . <br /> S. If interstitial monitoring sensors are present 2. Place the measuring stick vertically at the lowest <br /> within the containment sumps, temporarily point in the sump and extending above the water <br /> remove them before conducting the test . If the level in the sump to allow for an accurate mea - <br /> sensor is removed, reposition after testing to surement to be taken. The location of the mea- <br /> appropriate position according to the manutac- curing stick must remain the same foreacii water <br /> turer 's instructions , level measurement , Document the initial water <br /> 6, if the containment sump is found to have cracks, level measurement as measured from the bottom <br /> loose parts or separation of any joints or penetra - of the sump. Alternative measurement methods <br /> tion fittings, it is not considered to be liquid- may be used provided that die measurement to <br /> tight. This visually indicates a test failure , 1 / 16 ( 04063 ) inch can be made. <br /> 3. 'rake all precautions to prevent the water level <br /> CAUTION Water can damage electrical from being disturbed during the duration of the <br /> connections . Ensure that there are no test, <br /> components that can be damaged by the 4. After i hour, document the ending water level <br /> addition of water to the sump . If such measurement . ,WOO <br /> components are present , take appropriate <br /> precautions when performing the test or S. Upon completion of the test : <br /> use an alternative test method , remove all water and properly dispose of it <br /> according to Section 6. 7 ; <br /> • reinstall any interstitial monitorings sensors in <br /> their proper positions , <br /> • return the test boots or secondary contain- <br /> ment fittings to their pre-test operating con- <br /> _ --- _ - - - figurations ; <br /> Water Elodrlcal <br /> Level Junction <br /> Boz <br /> Eicctlicn' <br /> Gnnd -lir - - --- -- --- <br /> Watet <br /> Produrt Level - - <br /> Piping <br /> E14c2r <br /> Conduitud <br /> Noy wt <br /> FIGURE 6m5. The test fluid level in the UDC must be at �-- Piping <br /> least 4 Inches above the highest stamp penetration or <br /> i <br /> sdewall seam . <br /> —` — FIGURE 6-$ , To prevent leakage, check all penetration ./ <br /> fittings before adding water to ensure they make a tight <br /> seal, <br /> pei . org <br />
The URL can be used to link to this page
Your browser does not support the video tag.