My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
1151
>
2300 - Underground Storage Tank Program
>
PR0231429
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2021 9:53:20 AM
Creation date
9/2/2020 2:55:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0231429
PE
2361
FACILITY_ID
FA0000819
FACILITY_NAME
ONE STOP MARKET*
STREET_NUMBER
1151
Direction
W
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
21641001
CURRENT_STATUS
01
SITE_LOCATION
1151 W LOUISE AVE
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I . <br /> E M rm 1131 Model All 00 Overfill <br /> WHEATON RETAIL Prevention Valve OPV <br /> Flapper Valve rPrimary Float <br /> room <br /> POP <br /> �• a <br /> I <br /> Step 4: Slowly insert the Model A0081 - Figure 3 : Hook end secured to the Figure 4 : Close-up <br /> 1101 test tool from the bottom of the underside of the flapper valve , <br /> lower tube until the hook end secures to <br /> the underside of the flapper valve . <br /> Refer to Figures 3 and 4 for details. <br /> Testing the Primary Float and Flapper Valve: <br /> ` T . <br /> {1 <br /> r V <br /> Figure 5 : Primary float , down- <br /> y <br /> ward position . <br /> Step 5 : With the flapper valve latched Step 6 : Using a scribe move the prim <br /> open , and the hook end secured , gently mary float upward to unlatch the flapper <br /> tug on the test tool , the flapper valve valve , and with the hook end secured , <br /> must remain open . gently tug on the test tool , the flapper <br /> valve must close , the test tool will move <br /> about 3" downward , Refer to Figures Figure 6 : Primary float , upward <br /> 51 61 7 and 8 for details, position . <br /> I <br /> i <br /> I <br /> I = • <br /> Figure 7 : Prima ryfloat upward , flaPPer Figure 8 : Primary float upward , flapper Ste <br /> 7 : Using the scribe move the prim <br /> valve unlatched and closing . valve unlatched and closed . mary float downward . <br /> IMPORTANT: Perform steps 6 Step 10 : Re-install the fill adapter, cap <br /> through 8 a minimum of three times and spill container lid on the tank fill <br /> to assure the primary float , latch and riser. <br /> t flapper valve components of the <br /> Model A1100 OPV are operating prop- <br /> erly. <br /> Step 9 : Lift the Model A1100 OPV with <br /> the collar upward and re-install on the 2300 Industrial Park Dr. • Wilson , NC 27893 <br /> Step 8 : With the hook end secured , tank fill riser. Replace the drop tube 252-243-0150 • 252-243-4759 (fax) <br /> gently allow the flapper valve to move o- ring part number 569461 if damaged www,emcoretail .com <br /> upward and spring back into an open or missing . © 2018 Emco Wheaton Retail Corporation <br /> position , tug gently on the test tool , the <br /> 00 <br /> flapper valve must relatch and remain 2 0811 <br /> 8Rev. A <br />
The URL can be used to link to this page
Your browser does not support the video tag.