My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
9484
>
2300 - Underground Storage Tank Program
>
PR0232601
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/28/2020 1:25:14 PM
Creation date
9/3/2020 8:54:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0232601
PE
2361
FACILITY_ID
FA0004525
FACILITY_NAME
CHEVRON STATION #372736/2223
STREET_NUMBER
9484
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
09055063
CURRENT_STATUS
01
SITE_LOCATION
9484 WEST LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
255
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1534 Willow Pass Road,Pittsburg,CA 94565-1701 <br /> M c C a m p b e I l Analytical, Inc. Toll Free Telephone:(877)252-9262/Fax:(925)252-9269 <br /> "When Quality Counts" http://www.mccampbef.com/E-mail:main@mccampbell.com <br /> WORK ORDER SUMMARY <br /> Client Name: GHD SERVICES,INC. Project: 11202858-07.11;Chevron 372736 UDC Removal Work Order: 1910845 <br /> Client Contact: Mohamed Ibrahim QC Level: LEVEL 2 <br /> Contact's Email: mohamed.ibrahim@ghd.com Comments: Date Logged: 10/17/2019 <br /> ❑WaterTrax ❑WriteOn EDF ❑Excel EQuIS ::1 Email ❑HardCopy ❑ThirdParty ❑J-flag <br /> Lab ID Client ID Matrix Test Name Containers Bottle&Preservative De- Collection Date TAT Sediment Hold SubOut <br /> /Composites chlorinated &Time Content <br /> 1910845-OOIA SPI Soil SW6020(Lead) 1 160Z GJ,Unpres ❑ 10/17/2019 14:00 1 day ❑ <br /> Multi-Range TPH ❑ 1 day ❑ <br /> SW8260B(BTEX) ❑ 1 day ❑ <br /> 1910845-002A SP2 Soil SW6020(Lead) 1 160Z GJ,Unpres 10/17/2019 14:03 1 day ❑ <br /> Multi-Range TPH 1 day ❑ <br /> SW8260B(BTEX) 1 day ❑ <br /> 1910845-003A SP3 Soil SW6020(Lead) 1 160Z GJ,Unpres 10/17/2019 14:06 1 day ❑ <br /> Multi-Range TPH ❑ 1 day ❑ <br /> SW8260B(BTEX) ❑ 1 day ❑ <br /> 1910845-004A SP4 Soil SW6020(Lead) 1 160Z GJ,Unpres ❑ 10/17/2019 14:12 1 day ❑ <br /> Multi-Range TPH ❑ 1 day ❑ <br /> SW8260B(BTEX) ❑ 1 day ❑ <br /> NOTES: - STLC and TCLP extractions require 2 days to complete; therefore, all TATs begin after the extraction is completed (i.e., One-day TAT yields results <br /> in 3 days from sample submission). <br /> - MAI assumes that all material present in the provided sampling container is considered part of the sample - MAI does not exclude any material from <br /> the sample prior to sample preparation unless requested in writing by the client. <br /> Page 1 of 1 <br /> Page 15 of 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.