Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> SECONDARY CONTAINMENT TESTING REPORT FORM (Page 1 of 6) <br /> Type of Action ❑ Installation Test N Repair Test ❑ Six Month Test ❑ 36 Month Test <br /> I . FACILITY INFORMATION <br /> CERS ID Date of Secondary Containment Test <br /> 10181655 1 11 /06/ 19 <br /> Business Name (Same as Facility Name or DBA-Doing Business As) <br /> Chevron 372736 <br /> Business Site Address City ZIP Code <br /> 9484 West Ln Stockton 95210 <br /> II . UNDERGROUND STORAGE TANK SERVICE TECHNICIAN INFORMATION <br /> Name of UST Service Technician Performing the Test (Print as shown on the ICC Certification.) Phone # <br /> Nick Harvey (916) 834 - 5099 Ext. <br /> Contractor/Tank Tester License # ICC Certification # ICC Certification Expiration Date <br /> 300345 A B C61 /D40 HAZ 5115738 01 / 11 /2021 <br /> III . SUMMARY OF SECONDARY CONTAINMENT TESTING RESULTS <br /> Tank ID : (By tank number, stored product, etc.) A 87 B 91 C Diesel D <br /> Tank Containment <br /> Tightness Test Result N Pass ❑ Fail ❑ NA N Pass ❑ Fail ❑ NA ❑ Pass ❑ Fail N NA ❑ Pass ❑ Fail ❑ NA <br /> Product Piping Containment <br /> Tightness Test Result N Pass ❑ Fail ❑ NA N Pass ❑ Fail ❑ NA N Pass ❑ Fail ❑ NA ❑ Pass ❑ Fail ❑ NA <br /> Communication Test Result N Pass ❑ Fail ❑ NA N Pass ❑ Fail ❑ NA N Pass ❑ Fail ❑ NA ❑ Pass ❑ Fail ❑ NA <br /> Remote Fill Piping Containment <br /> Tightness Test Result ❑ Pass ❑ Fail N NA ❑ Pass ❑ Fail N NA ❑ Pass ❑ Fail N NA ❑ Pass ❑ Fail ❑ NA <br /> Communication Test Result ❑ Pass ❑ Fail N NA ❑ Pass ❑ Fail N NA ❑ Pass ❑ Fail N NA ❑ Pass ❑ Fail ❑ NA <br /> Vent Piping Containment <br /> Tightness Test Result N Pass ❑ Fail ❑ NA N Pass ❑ Fail ❑ NA N Pass ❑ Fail ❑ NA ❑ Pass ❑ Fail ❑ NA <br /> Communication Test Result N Pass ❑ Fail ❑ NA N Pass ❑ Fail ❑ NA N Pass ❑ Fail ❑ NA ❑ Pass ❑ Fail ❑ NA <br /> Vapor Recovery Piping Containment <br /> Tightness Test Result N Pass ❑ Fail ❑ NA N Pass ❑ Fail ❑ NA N Pass ❑ Fail ❑ NA ❑ Pass ❑ Fail ❑ NA <br /> Communication Test Result N Pass ❑ Fail ❑ NA N Pass ❑ Fail ❑ NA N Pass ❑ Fail ❑ NA ❑ Pass ❑ Fail ❑ NA <br /> Turbine / Product Piping Sump <br /> Tightness Test Result N Pass ❑ Fail ❑ NA N Pass ❑ Fail ❑ NA N Pass ❑ Fail ❑ NA ❑ Pass ❑ Fail ❑ NA <br /> Fill Riser Sump <br /> Tightness Test Result N Pass ❑ Fail ❑ NA N Pass ❑ Fail ❑ NA N Pass ❑ Fail ❑ NA ❑ Pass ❑ Fail ❑ NA <br /> Vent / Transition Sump ID : a b C d <br /> Tightness Test Result ❑ Pass ❑ Fail ❑ NA ❑ Pass ❑ Fail ❑ NA ❑ Pass ❑ Fail ❑ NA ❑ Pass ❑ Fail ❑ NA <br /> UDC ID : 1 2 3 4 <br /> Tightness Test Result ❑ Pass ❑ Fail ❑ NA ❑ Pass ❑ Fail ❑ NA ❑ Pass ❑ Fail ❑ NA ❑ Pass ❑ Fail ❑ NA <br /> UDC ID : 5 6 7 8 <br /> Tightness Test Result ❑ Pass ❑ Fail ❑ NA ❑ Pass ❑ Fail ❑ NA ❑ Pass ❑ Fail ❑ NA ❑ Pass ❑ Fail ❑ NA <br /> UDC ID : J 10 11 12 <br /> Tightness Test Result ❑ Pass ❑ Fail ❑ NA ❑ Pass ❑ Fail ❑ NA ❑ Pass ❑ Fail ❑ NA ❑ Pass ❑ Fail ❑ NA <br /> All items marked "Fail' or "N/A " must be explained in their respective "COMMENTS" section. <br /> IV. CERTIFICATION BY UST SERVICE TECHNICIAN CONDUCTING THIS TESTING <br /> I hereby certify that the secondary containment was tested in accordance with California Code of Regulations , title 23 , <br /> division 3 , chapter 16 , section 2637 and all the information contained herein is accurate. <br /> UST Service Technician Signature <br /> CERS = California Environmental Reporting System, ID = Identification, UST = Underground storage tank, ICC = International Code Council, <br /> NA = Not applicable, UDC = Under-dispenser containment <br /> i <br />