My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
9484
>
2300 - Underground Storage Tank Program
>
PR0232601
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/28/2020 1:25:14 PM
Creation date
9/3/2020 8:54:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0232601
PE
2361
FACILITY_ID
FA0004525
FACILITY_NAME
CHEVRON STATION #372736/2223
STREET_NUMBER
9484
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
09055063
CURRENT_STATUS
01
SITE_LOCATION
9484 WEST LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
255
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chevron Monitoring Certification Checklist <br /> Store Number: Address : 9484 West Lane Stockton, CA 95210 <br /> Date: 2/ 19/2019 Technician : Jesus Saldivar Company: TANKNOLOGY INC. <br /> Step Instruction 1 2 T-3 diesel <br /> Product UNLEADED PREMIUM Diesel <br /> Tank Type Fiberglass Fiberglass Fiberglass <br /> (DW FRP, DW Steel, SW FRP) <br /> 1 Annular Riser Height ( measured ) <br /> 2 Tank Diameter: (from tank chart 119 . 00 in. 92 .00 in . 92 .00 in. <br /> forexample : 118. 375 ", 117. 75 ", 111 ",92 , etc. ) <br /> 3 For FRP tanks, 1/2 circumference of the tank <br /> 186 . 83 in. 144 .44 in. 144.44 in. <br /> (0.5 X 3. 14 X tank diam.) OR (q.57 x step 2) <br /> Required annular sensor length : <br /> 4 FRP = Riser + 1/2 Circumference = step 1 + step 3 186 . 83 in. 144 .44 in. 144 .44 in. <br /> Steel = Riser + diameter = step 1 + step 2 <br /> Mark & label the required sensor length on <br /> 5 sensor cord . Label should be under the cap & Yes Yes Yes <br /> serve to prevent the cord being pulled too short . <br /> Is tank annular sensor in the correct position ? <br /> Yes Yes Yes <br /> 6 FRP Tanks: with the marked required length <br /> lining up with the top of the annular riser? Yes Yes Yes <br /> Steel Tanks : sensor touching bottom with slack <br /> above the marked required sensor length ? <br /> Are the DW pipe boots pulled back in tank sumps? <br /> 8 (YIN or N/A, note if can 't be verified because Yes Yes Yes <br /> clamshell pointing down) <br /> Are tank sump sensors back in their holders and <br /> 9 in the correct position ? Yes Yes Yes <br /> (YIN or N/A document with photo) <br /> 7 Approximate gallons of product dispensed for <br /> purging, etc . and returned to tank <br /> Has the Veeder Root Battery been replaced & dated prior to failsafe ? <br /> (If battery backup failed, label and leave failed battery on top of console, note in comments and advise your OM) Replaced in Last 30 Days <br /> Has Veeder Root Programming before & after testing been printed & verified ? Yes <br /> (especially tank manifolding setup - see Note 2) <br /> Has Veeder Root Programming before & after been attached to the Work Order? Yes <br /> Have all sensor model numbers been verified against the Veeder Root cord label ? <br /> -2 with missing labels Yes <br /> Make a note if sensor label missing or illegible, & approx. cord length for -2081-209 g <br /> Additional Comments : j <br /> SITE HAD 301 BRINE SENSORS <br /> automatically revert to the default tank manifold settings anytime the programming is changed, such as when sensors are <br /> Note 1: Certain Veeder Root Software versions will auto y B Y P B g B <br /> temporarilyX'ed out, etc. <br /> i <br /> I <br /> I <br /> t <br /> I <br /> i <br /> l <br />
The URL can be used to link to this page
Your browser does not support the video tag.