My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
9484
>
2300 - Underground Storage Tank Program
>
PR0232601
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/28/2020 1:25:14 PM
Creation date
9/3/2020 8:54:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0232601
PE
2361
FACILITY_ID
FA0004525
FACILITY_NAME
CHEVRON STATION #372736/2223
STREET_NUMBER
9484
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
09055063
CURRENT_STATUS
01
SITE_LOCATION
9484 WEST LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
255
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
W . O . # NW 1 - 2338728 Cust Ref # : COCO - 0015297489 <br /> 2. To determine lower tube distance from tank <br /> bottom to bottom of cut; <br /> Subtract valve length (IM from distance to tank <br /> bottom (B) � ' �s <br /> M = ($) twi <br /> Cast lug <br /> Note. Lower tube clearance must meet tank manu- In , , 5o <br /> facturer requirements and all AHJ, local, state, and na- body <br /> tional codes. Typical clearance is about 4" if lower Float direction <br /> tube clearance is not met valve must be removed and <br /> adjusted to meet these requirements. <br /> 3 . To determine lower tube distance from tank <br /> bottom to top of tut% <br /> Subtract valve length (U) from distance to tank <br /> bottom (B) <br /> M (B) — (Lit = � <br /> View Pato drop tubi from above <br /> Note: Lower tube distance from tank bottom to top <br /> of cut must meet all AM, local, state, and national <br /> codes. For reference per 40 CFR 63 subpart CCCCCC / <br /> NESHAP the lower tube can be no more than 6° from <br /> the bottom of the tank If lowertube distance is not <br /> met valve must be removed and adjusted to meet these <br /> requirements, <br /> i <br /> 4 . To determine float alignment <br /> Looking Into upper tube (see figure) the float should be <br /> F aligned along the length of the tank If float is not <br /> aligned properly adjustments need to be made. <br /> I <br /> 21 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.