My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
9484
>
2300 - Underground Storage Tank Program
>
PR0232601
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/28/2020 1:25:14 PM
Creation date
9/3/2020 8:54:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0232601
PE
2361
FACILITY_ID
FA0004525
FACILITY_NAME
CHEVRON STATION #372736/2223
STREET_NUMBER
9484
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
09055063
CURRENT_STATUS
01
SITE_LOCATION
9484 WEST LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
255
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OPW Installation , Operation , and Maintenance Manual , Page 73 Executive Order VR- 1024 <br /> signal that the tank is full . Close transport delivery valve HOW TO LOCATE THE POSITION OF THE 61 SO AT li <br /> and drain hose into tank before disconnecting any hose 95% TANK CAPACITY <br /> �t <br /> fitting . ( Shut-off points can be adjusted to any capacity to <br /> Overfilled Tank : Failure of the hose to drain after clos- comply with AHJ Requirements) <br /> in the deliver valve signals an overfilled tank . Do Not <br /> disconnect any delivery hose fitting until the liquid level The length of the upper tube and the placement of the <br /> in the tank has been lowered to allow the hose to drain 61 SO valve body determine the shut-off point . Follow <br /> into the tank . ing the standard instructions for the OPW 61 SO will pro- <br /> vide for initial shutoff at 95 % . In all cases , the upper € <br /> WARNING tube length must be a minimum of 6 - 1 /2" plus the <br /> In the event you are splashed with fuel remove wet length of the riser pipe . All length measurements are in <br /> clothing immediately . Skin contact with gasoline inches . <br /> can cause chemical burns and may result in yl <br /> Inhalation of vapors that maybe fatal . Never go INSTRUCTIONS <br /> inside confined areas after being splashed and <br /> never go near ignition sources . 1 ) Find tank capacity ( in gallons) from tank calibration <br /> chart provided by tank manufacturer . <br /> IMPORTANT <br /> 2 ) Calculate 95 % of capacity , <br /> Determine if the underground storage tank is equipped <br /> with a ball float vent valve , as illustrated in Figure 16 . In 3 ) Locate the 95 % volume number on the tank calibra- <br /> all systems , the shut-offpointofthe61SOmustbe tion chart . <br /> reached before the ball float reduces flow to ensure 4 ) Find the dipstick number ( X) which corresponds to <br /> proper overfill valve operation . the 95 % tank volume . And , find the dipstick num - <br /> TOOLS NEEDED FOR INSTALLATION AND ASSEM- ber ( Y ) which corresponds to the 100 % volume . <br /> BLY : I, <br /> 5 ) Subtract the dipstick number (X ) from the tank di- € <br /> 1 . Drill ameter ( Y) to find the upper tube reference number � <br /> 2 . A sharp 1 /8" pilot drill bit (Z) . <br /> r <br /> 3 . A sharp 5/ 16 " drill bit ( Y ) - ( X ) _ (Z) 1 <br /> 4 . Tape measure 6) Subtract 2 from (Z) to find the upper tube depth c <br /> 5 . Hacksaworcut- off saw , finetooth ; 24teeth/inch ( C ) , <br /> 6 . Fine half round file (Z) - 2 = C <br /> T Screwdriver - Phillips blade 7 ) Is C less than 6w1 /2 " ? l <br /> €x <br /> 8 . 1 /2 " Wrench or socket <br /> I <br /> 9 . Two- part sealant ( Supplied ) NO Upper tube length is C plus the distance from <br /> 10 . Torque Wrench the top of the Face Seal Adaptor installed on the <br /> WARNING riser pipe to the inside , top lip of the storage <br /> r tank (A) . <br /> I Using electrically operated equipment near gasoline <br /> or gasoline vapors may result in fire or explosion , Upper Tube Length = C + (A) <br /> causing personal injury and property damage . <br /> Check to assure the working area is free from such YES Upper tube length is 6 - 1 /2 " plus the riser pipe <br /> hazards , and always use proper precautions . measurement (A) . <br /> IMPORTANT : The figures in this installation and <br /> maintenance instruction may contain vapor recovery Upper Tube Length = 6- 112 " + (A) <br /> equipment (including model numbers ) that is not certk <br /> tied by the CaliforniaAir Resources Board ( GARB ) fora NOTE : You must find the actual tank capacity num - <br /> specific Phase I Vapor Recovery System . Pleasereferto ber that correlates to the 6- 1 /2" + (A) depth for the <br /> Exhibit 1 of the appropriate CARB Phase I Executive Or- station records . This number may also be used for <br /> derfor a list of certified Phase I Vapor Recovery System the purposes of calibrating an electronic tank level <br /> Equipment . system . <br />
The URL can be used to link to this page
Your browser does not support the video tag.