My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
9484
>
2300 - Underground Storage Tank Program
>
PR0232601
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/28/2020 1:25:14 PM
Creation date
9/3/2020 8:54:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0232601
PE
2361
FACILITY_ID
FA0004525
FACILITY_NAME
CHEVRON STATION #372736/2223
STREET_NUMBER
9484
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
09055063
CURRENT_STATUS
01
SITE_LOCATION
9484 WEST LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
255
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OPW Installation , operation , and Maintenance Manual , Page 75 Executive Order VR- 102-Q eAeel' <br /> Tapemeasure CAUTION - DO NOT use a pipe or tubing cutter to cut <br /> the upper drop tube , this may damage the tube , <br /> causing it to be out of round thereby prohibiting <br /> assembly of the unit . <br /> E5 � <br /> Riser Pipe w' k <br /> Pace Seal (A ) , <br /> Adaptor To Tank <br /> Top (I D ) (B ) ,. y'' <br /> To Tard <br /> 8ottorn <br /> Figure 1 <br /> A <br /> 44 T <br /> r <br /> t; <br /> I' NiNPPPe Figure 3 <br /> STEP 4 : FILE THE UPPER DROP TUBE <br /> File the upper tube square , and <br /> remove any burrs or rough edges . <br /> OPW split <br /> s+ <br /> Container Make sure the cut is flat and <br /> Measure to here square . <br /> Toror arc Screw Jack Screw ' <br /> ,,,gtaaanDn (rop Kit IMPORTANT : Carefullyfile a good R <br /> or Face sea) chamfer on the inside edge of the <br /> Adaptor) O Ring Seal <br /> drop tube to provide a lead - in for <br /> �-- Face sea ) the o-tin and inlet tube installedel <br /> Adaptor 9 I ? <br /> in Step 6 . <br /> i <br /> Figure 1A CAUTION : Failure to properly Figure 4 <br /> apply and cure sealant may re- <br /> suit in a failure of a pressure de- <br /> cay leak test . - <br /> STEP 5 : APPLY SEALANT r <br /> TransferMarkFrom <br /> �tick�o_uP:�er Prepare sealant by thoroughly <br /> Tube mixing 1 / 3 of each packet togeth- <br /> er until color is uniform , Gener- <br /> seam oust apply sealanttothe inside <br /> Figure 2 y pp y <br /> diameteroftheupperdroptube . Figure <br /> (For rrc ^ less than or equal to 6412 only) Make sure coverage is completely <br /> around the tube as shown in Fig . <br /> STEP 3 : CUT THE UPPER DROP TUBE 5 ' <br /> tubesquarely , at the mark <br /> Carefully saw through the STEP 6 : INSTALL INLET TUBE <br /> made in Step 2 . Use a hacksaw with a new fine-tooth Install o-ring in the o- ring groove <br /> blade . Rotating the upper tube as the sawing progress - of inlettube ( DO NOT USE t <br /> es will minimize run out and ensure a square 90-degree <br /> GREASE ) , Insert the inlettube 4` <br /> cut , A piece of paper, taped square with the tube or tnstal � c. a�r�. <br /> p� p P P q into the upper tube until it seats L. Groove <br /> hose clamp can be used as guides for making a square against the flange on the upper Figure 6 <br /> cut6 inlet tube . <br /> rt <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.