My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
9484
>
2300 - Underground Storage Tank Program
>
PR0232601
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/28/2020 1:25:14 PM
Creation date
9/3/2020 8:54:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0232601
PE
2361
FACILITY_ID
FA0004525
FACILITY_NAME
CHEVRON STATION #372736/2223
STREET_NUMBER
9484
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
09055063
CURRENT_STATUS
01
SITE_LOCATION
9484 WEST LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
255
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
VA <br /> ? 1 <br /> OPW Installation , Operation , and Maintenance Manual , Page 77 Executive Order VR- 102-Q <br /> , n <br /> 1 PORTANT : Before installing the valve , allow seal - CAUTION : No obstruction in the tank can be within 13" <br /> lint to cure for 24 hours . from the center of the riser pipe or the valve may not <br /> lI <br /> operate properly . j <br /> STEP 16 : ALIGN VALVE <br /> STEP 13 : REMOVE ELASTIC BANDInstall the OPW Jack Screw Kit and a 4 " nipple to lock <br /> Remove the elastic band securingthe float to the valve FF2 <br /> the valve in place . Refer to the Installation Instructions fF <br /> �� <br /> body , The float will move into an outward position . supplied with the Jack Screw Kit . Install the Rotatable <br /> STEP 14 : INSERT DROP TUBE Product Adaptor ( Refer to Installation Instructions sup- <br /> Make sure the 011 gasket is under plied with the Rotatable Product Adaptor . ) Make sure <br /> the flange of the inlet tube . Hold the ; that the valve does not rotate while tightening the 3 <br /> floatdown againstthevalve body and adaptor by observing the position of the deflector . The <br /> slowly insert the drop tube overfill valve valve must remain aligned along the length of the tank tl <br /> t <br /> into the riser pipe . Do not force valve - as in Step 15 . Repeat this step as necessary to assure p,a <br /> into the riser pipe . If any obstruction or proper valve alignment . <br /> i <br /> foreign matter interfereswithsmooth ' <br /> 'Ja ¢i Re : very F 'I F�5e* t <br /> insertion of the valve , the riser pipe musts <br /> becleared . <br /> WARNING Failure to follow the assern <br /> bly and installation instructions or use ` 11 31 <br /> pj <br /> of excessive force to Insert the OPW hiak <br /> 6150 will VOID THE WARRANTY ! <br /> 63 F ,;ki t ' <br /> Difficulty in removing the existing fill ! 1 , <br /> tube ( if there isone ) meanstheremay <br /> be an obstruction in the riser pipe . Look i T4oe _ <br /> t �� 0 <br /> for burrs , deformations , excess tank lin - r" `°" "°' ` <br /> R�gWrmm�+ri5 <br /> ing material or other projections that may interfere with <br /> easy insertion of the OPW 61 SO . The 61 SO is designed a• t <br /> for insertion into schedule 40 pipe . If schedule 80 pipe <br /> has been used for the riser , the 61 SO cannot be in - ""' `s Ur ``"' `"=rfJ L+ ot � 'art <br /> stalled . If seamed pipe has been used , the internal weld i <br /> bead may interfere with the OPW 61 SO and prevent Figure 16 <br /> installation , If the OPW 61 SO won 't slip in easily DON ' T — - <br /> FORCE ITI Damage to the valve may result if excess <br /> force is used . Examine the riser pipe carefully ; deter- <br /> mine the nature of the obstruction ; take appropriate <br /> steps to remove it. <br /> STEP 15 : CHECK INSTALLATION <br /> -- t, <br /> Insert the drop tube all the way into <br /> the tank until the flange and gasket --= t <br /> seat onto the top of the Face Seal <br /> Adaptor . The float will swing out �\ <br /> into the operating position as it — <br /> passes into the tank . Make sure <br /> � j <br /> that the float is aligned along the cc1 o <br /> length of the tank . The length of ` � ` " t' <br /> the tank can easily be determined <br /> by locating other manholes or <br /> pump boxes that are installed Figure 16A i <br /> around other tank fittings . Look � Ffgare- tE <br /> into the drop tube and align the deflector i <br /> with the length of the tank . <br /> 3 <br /> Fq <br /> E <br />
The URL can be used to link to this page
Your browser does not support the video tag.