My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
9484
>
2300 - Underground Storage Tank Program
>
PR0232601
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/28/2020 1:25:14 PM
Creation date
9/3/2020 8:54:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0232601
PE
2361
FACILITY_ID
FA0004525
FACILITY_NAME
CHEVRON STATION #372736/2223
STREET_NUMBER
9484
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
09055063
CURRENT_STATUS
01
SITE_LOCATION
9484 WEST LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
255
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
k, <br /> OPW Installation , Operation , and Maintenance Manual , Page 73 Executive Order VR- 1 02-Q <br /> signal that the tank is full . Close transport delivery valve HOW TO LOCATE THE POSITION OF THE 61 SO AT <br /> and drain hose into tank before disconnecting any hose 95% TANK CAPACITY <br /> fitting . ( Shut- off points can be adjusted to any capacity to <br /> comply with AHJ Requirements ) <br /> Overfilled Tank : Failure of the hose to drain after clos- ) <br /> ing the delivery valve signals an overfilled tank . Do Not The length of the upper tube and the placement of the " <br /> disconnect any delivery hose fitting until the liquid level 61 SO valve body determine the shut-off point . Follow- ' <br /> in the tank has been lowered to allow the hose to drain <br /> into the tank . ing the standard instructions for the OPW 61 SO will pro- <br /> vide for initial shutoff at 95 % . In all cases , the upper <br /> WARNING tube length must be a minimum of 6 - 1 /2" plus the <br /> In the event you are splashed with fuel remove wet length of the riser pipe , All length measurements are in <br /> clothing immediately . Skin contact with gasoline inches . <br /> can cause chemical burns and may result in <br /> inhalation of vapors that maybe fatal . Nevergo INSTRUCTIONS <br /> inside confined areas after being splashed and <br /> 1 ) Find tank capacity (in gallons ) from tank calibration <br /> never go near ignition sources . chart provided by tank manufacturer . <br /> IMPORTANT 2 ) Calculate 95 % of capacity <br /> Determine if the underground storage tank is equipped <br /> with a ball float vent valve , as illustrated in Figure 16 , In 3 ) Locate the 95 % volume number on the tank calibra- z <br /> all systems , the shut-off pointofthe6lSOmustbe tion chart , <br /> reached before the ball float reduces flow to ensure 4 ) Find the dipstick number ( X ) which corresponds to <br /> proper overfill valve operation . the 95 % tank volume , And , find the dipstick num - <br /> TOOLS NEEDED FOR INSTALLATION AND ASSEM- I <br /> ber ( Y ) which corresponds to the 100 % volume . <br /> BLY : <br /> 5 ) Subtract the dipstick number ( X ) from the tank di- [ <br /> 1 . Drill ameter (Y) to find the upper tube reference number <br /> %1 <br /> 2 . A sharp 1 /8" pilot drill bit (Z ) . <br /> i' <br /> 3 . A sharp 5/ 16 " drill bit (Y) - ( X ) _ (Z) r <br /> kI <br /> 4 . Tape measure 6 ) Subtract 2 " from (Z) to find the upper tube depth <br /> i <br /> 5 . Hacksaw orcut-off saw , finetooth ; 24teeth /inch ( C ) . <br /> i <br /> 6 . Fine half round file (Z) 2 " = C <br /> r; <br /> 7 . Screwdriver - Phillips blade7 ) Is C less than 6 112"? j <br /> 8 . 1 /2 " Wrench or socket ` <br /> k? <br /> 9 . Two- part sealant ( Supplied ) NO Upper tube length is C plus the distance from <br /> 10 . Torque Wrench the top of the Face Seal Adaptor installed on the <br /> WARNING riser pipe to the inside , top lip of the storage <br /> tank ( A) . <br /> Using electrically operated equipment near gasoline <br /> or gasoline vapors may result in fire or explosion , Upper Tube Length = C + (A) Y <br /> causing personal injury and property damage . <br /> j Check to assure the working area is free from such YES Upper tube length is 6- 1 /2 " p lus the riser pipe <br /> er recautions .hazards and always use prop <br /> measurement (A ) . <br /> IMPORTANT : The figures in this installation and <br /> maintenance instruction may contain vapor recovery Upper Tube Length = 6 - 112 " + (A) <br /> equipment ( including model numbers ) that is not certk <br /> fied bythe CaliforniaAir Resources Board ( CARB ) fora NOTE : You must find the actual tank capacity num - <br />' specific Phase I Vapor Recovery System , Pleasereferto ber that correlates to the 6- 112 " + (A) depth for the <br /> i Exhibit 1 of the appropriate CARB Phase I Executive Or- station records . This number may also be used for <br /> E derfora list of certified Phase I Vapor Recovery System the purposes of calibrating an electronic tank level s <br /> Equipment . system . <br /> I <br /> E ' <br /> I <br /> f <br /> i <br /> k <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.