My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WP0040712
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
NEW CASTLE
>
6969
>
4200/4300 - Liquid Waste/Water Well Permits
>
WP0040712
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/3/2020 10:33:33 AM
Creation date
9/3/2020 10:12:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4200/4300 - Liquid Waste/Water Well Permits
RECORD_ID
WP0040712
PE
4374
STREET_NUMBER
6969
Direction
S
STREET_NAME
NEW CASTLE
STREET_TYPE
RD
City
STOCKTON
Zip
95215-
APN
18111005
ENTERED_DATE
4/7/2020 12:00:00 AM
SITE_LOCATION
6969 S NEW CASTLE RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
TSok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Is Ir <br /> PURV ANICE <br /> DR LLERS, JOB ESTIMATE <br /> NC. <br /> P.O. BOX 64 (209) 887-3554 <br /> LINDEN, CALIF. 95236 CONTRACTORS LIC.#37 923 Page: 1 <br /> I P <br /> Quoted To: HONE DATE <br /> Pete Thompson JOB NAME/LOCATION Feb 19, 2020 <br /> 6969 S New Castle Rd <br /> Stockton,CA 95215 <br /> ! Quote Number. 3443 <br /> JOB DESCRIPTION: <br /> CustormrID I Good Thru Customer PO/Job ID <br /> thomp 3/20/20 Abandon well on NewCastle Rd <br /> Quantity uOM Description Unit Price Amount <br /> RE:Well abandonment on New Castle Rd <br /> The pump is stuck in the well and requires <br /> stronger than normal blasting charges to split the <br /> pump column and well casing at the same time. <br /> Proposed scope of work <br /> 1. Tremmie pipe fill 110 feet of 10 inch pump <br /> column from the botton upwith 9 yards neat <br /> cement. Additional cement required will be 10.3 <br /> sack cement <br /> 2 .Blast 110 feet of 10 inch pump column and 14" <br /> well casing at the same time with C-4. <br /> 3. Top off well with 10.3 sack sand and cement to <br /> ground level. <br />
The URL can be used to link to this page
Your browser does not support the video tag.