Laserfiche WebLink
�KL KLEINFELDER <br /> benchmark by subtracting them from the surveyed casing elevations. The water purged from the <br /> piezometers will be discharged on the ground. The resulting groundwater elevations will be used to <br /> assess the direction of the groundwater gradient at the time of the soundings. <br /> Task E04 - Reportin>� <br /> Upon completion of the field activities, a report of our observations and findings for Tasks E01 <br /> through E03 will be prepared for you. The report will include: <br /> • A description of the field activities, observations, and protocols <br /> • Lithologic Logs (if applicable) <br /> • A graphical representation of piezometer locations <br /> • Description and documentation of QA/QC procedures employed for field and laboratory <br /> work <br /> All information gathered during the study by Kleinfelder is considered confidential and will be <br /> released only upon written authorization from the client or as required by law. California law <br /> requires a person to inform the state if a situation is encountered that can be considered an <br /> immediate endangerment to the public's health or welfare and/or to the environment. <br /> CLIENT RESPONSIBILITIES AND ASSUMPTIONS <br /> This proposal and the attached cost estimate is based on the following assumptions: <br /> • The client will provide Kleinfelder with formal authorization for the proposed <br /> work <br /> • Adequate work space and access will be provided by the client. <br /> • Granite Construction will provide equipment and operators if necessary for access <br /> and adequate work space for the drill rig within the proposed gravel pits. <br /> • Kleinfelder's cost estimate is based upon encountering groundwater at <br /> approximately 65 feet above mean sea level (msl). If groundwater is encountered <br /> at lesser or greater depths, costs will be adjusted accordingly. <br /> • Kleinfelder is not responsible for the site safety of others. <br /> • Soil and/or water generated during the sampling will be the responsibility of the <br /> client. The drill cuttings and water generated will not be contained and will be <br /> left on site. <br /> • This proposal is based on the presumption that Granite Construction will clearly <br /> mark utilities and will provide any and all available survey maps or other data to <br /> determine the location of tanks, existing structures, underground utilities and <br /> services. <br /> 20-YP9-278/2019P314/2019W028 Page 3 of 6 <br /> Copyright 1999,Kleinfelder,Inc. October 27, 1999 <br />