My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
30909
>
2900 - Site Mitigation Program
>
PR0515699
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/3/2020 10:44:25 AM
Creation date
9/3/2020 10:35:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0515699
PE
2950
FACILITY_ID
FA0012294
FACILITY_NAME
GRANITE CONSTRUCTION CO
STREET_NUMBER
30909
Direction
S
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
25310006
CURRENT_STATUS
01
SITE_LOCATION
30909 S TRACY BLVD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
k'q KLEINFELDER <br /> During the course of the performance of Kleinfelder's services, hazardous materials may be <br /> discovered. Kleinfelder will assume no responsibility or liability whatsoever for any claim, loss <br /> of property value, damage, or injury that results from pre-existing hazardous materials being <br /> encountered or present on the project site, or from the discovery of such hazardous materials. <br /> Nothing contained in this proposal should be construed or interpreted as requiring Kleinfelder to <br /> assume the status of an owner, operator, generator, or person who arranges for disposal, <br /> transport, storage or treatment of hazardous materials within the meaning of any governmental <br /> statute, regulation or order. Granite Construction will be solely responsible for notifying all <br /> governmental agencies, and the public at large, of the existence, release, treatment or disposal of <br /> any hazardous materials observed at the project site, either before or during performance of <br /> Kleinfelder's services. Granite Construction will be responsible for all arrangements to lawfully <br /> store, treat, recycle, dispose, or otherwise handle hazardous materials, including cuttings and <br /> samples resulting from Kleinfelder's services. <br /> Kleinfelder will perform its services in a manner consistent with the standards of care and skill <br /> ordinarily exercised by members of the profession practicing under similar conditions in the <br /> geographic vicinity and at the time the services will be performed. No warranty or guarantee, <br /> expressed or implied, is part of the services offered by this proposal. <br /> All information gathered during the study by Kleinfelder is considered confidential and will be <br /> released only upon written authorization from the client or as required by law. California law <br /> requires a person to inform the state if a situation is encountered that can be considered an <br /> immediate endangerment to the public's health or welfare and/or to the environment. Therefore, <br /> the client shall be contractually bound to make said disclosures in lieu of Kleinfelder, its owners, <br /> principals, employees or subcontractors. <br /> This document may be used only by the client and only for the purposes stated, and within a <br /> reasonable time from its issuance. Land use, site conditions (both on site and off site) or other <br /> factors may change over time, and additional work may be required with the passage of time. <br /> Any party other than the client who wishes to use this document is requested to notify <br /> Kleinfelder of such intended use in writing. Based on the intended use of the document, <br /> Kleinfelder may require that additional work be performed and that an updated document be <br /> issued. Non-compliance with any of these requirements by the client or anyone else will release <br /> Kleinfelder from any liability resulting from the use of this document by any unauthorized party. <br /> The fees presented in this proposal are based on prompt payment for services presented in the <br /> standard invoicing format. Additional charges will be applied for specialized invoicing if backup <br /> documentation is needed. These special services will be charged on a time and expense basis. <br /> Late fees will be charged if payment is not received in accordance with terms contained in our <br /> contract. <br /> 20-YP9-278/2019P314/2019W028 Page 5 of 6 <br /> Copyright 1999,Kleinfelder,Inc. October 27, 1999 <br />
The URL can be used to link to this page
Your browser does not support the video tag.